VALAR WATCH
Key findingsTheir claims, annotatedEvidenceTake action
374 facts · 512 sources · updated 2026-09-30

Claims vs Record disc-011

unresolvedsafety 'Walk-away' cooling: Valar's design target is 72 hours hands-off; DOE's review says 'indefinitely'; neither analysis is public

What was said

What the record shows

The gap: Valar's safety paper sets a minimum target of 72 hours with no operator action; DOE's categorical-exclusion review, under which no full environmental study was required, states that the passive system keeps fuel within limits indefinitely. A design can exceed its minimum target, so the two are not in conflict. The stronger 'indefinitely' is not backed by any public analysis, and the 26 June demonstration rests on Valar's account.
In plain terms'Walk-away safe' means that after shutdown the reactor can shed its leftover heat with no pumps, no power and no people. Valar's safety paper sets a minimum target: nobody needs to act for at least 72 hours. DOE's environmental review goes further and says the cooling works 'indefinitely.' Both can be true, because a design can beat its minimum. What is missing is proof the public can see: the heat analysis behind 'indefinitely' is not published, and Valar's 26 June public test of passive cooling has no DOE or outside record.

Why it matters: DOE relied on attributes like this to find the risk of an offsite release low enough for a categorical exclusion.

What would settle it: FOIA to DOE Idaho Operations Office for the approved DSA's decay-heat analysis, the 26 June 2026 test plan and results, the Joint Test Group records and the power history before the test.

facts safe-020, csite-009, csite-020, plan-006 · checked 2026-09-29: Defence pass 2026-09-29: Defended: re-read NSDA pp. 15 and 23 (72 hours is 'target performance'; conduction path 'cannot be disabled') and CX p. 5. A minimum target and an analysed indefinite capability are compatible, so the earlier 'conflict' does not survive; what remains is that neither the decay-heat analysis nor the 26 June test is public. Moved to unresolved; summary line rewritten to state only what the records show. | Earlier verify pass: Re-read on 2026-09-29: CX p. 5, NSDA p. 23, Castle Country, ANS (quotes exact). | Correction 2026-09-29 (wording review): verification wording updated ('summary line'). Correction 2026-10-01 (precision review): wording made more exact against the cited records.