Claims tied to the company or its sites, lode claims in Emery and Carbon counties, new lode claims in Utah, and the law on what claims may be used for.
Mining-claim markers stand in Carbon County. The Notice of Location posted at one of them (fld-002) names Valar Atomics Inc as locator of the RW 453 lode claim in Section 28, Township 14 South, Range 11 East, about 3.4 miles northeast of central Wellington, measured to the section's centre (BLM survey grid, dir-002).
- Field observation (September 2026) (resident, 2026-09) resident fieldwork
BLM's survey grid places Section 28, T14S R11E SLM at 39.572-39.586 N, 110.683-110.702 W, directly two miles south of Section 16 (the land the state approved leasing to Valar) and about 3.4 miles northeast of central Wellington. Carbon County's parcel records (compiled statewide by UGRC; parcel shapes current as of 26 November 2025, ownership layer of 18 June 2026) show one federal parcel, 2A-1292-028F (200 acres, recorded as held by the 'United States of America'), in four pieces: about 80 acres in the NE quarter and about 40 acres in each other quarter. Everything else is private. Laying the parcel shapes over the section on a fine grid, the north half (the NW and NE quarters, 320 acres, where the notice places RW 453) is about 119 acres federal (37%), about 100 acres in 17 parcels the county assessor classes as 'Single Family' (residential), and about 93 acres in parcels classed 'Commercial'. The assessor layer does not record whether a house stands on each parcel. BLM's generalized surface-management layer marks the whole section 'Private or Unknown'; the parcel records are the finer source. A lode claim is valid only over federally owned minerals: on the federal pieces if the land is open to mineral entry, and on private surface only where the United States kept the minerals, where Stock-Raising Homestead Act rules require certified-mail notice to the surface owner 30 days before entry (43 CFR 3838.11). Who owns the minerals under the private parcels is not shown in the layers read, and because the notice's survey tie points outside the section (dir-001), where exactly the claim lies within the north half cannot be told from the notice.
- Utah government-owned parcels (UGRC; source Carbon County, 2026-06-18): parcel 2A-1292-028F, four polygons (Utah Geospatial Resource Center / Carbon County, 2026-06-18) primary government “UNITED STATES OF AMERICA”
- Carbon County parcels (UGRC LIR, current as of 2025-11-26): all parcels intersecting Section 28, with property class (Utah Geospatial Resource Center / Carbon County Assessor, 2025-11-26) primary government
- BLM PLSS CadNSDI, first division UT260140S0110E0SN280 (Section 28) (Bureau of Land Management) primary government
Utah's mineral occurrence records (the USGS / Utah Geological and Mineral Survey records compiled by UGRC) list six occurrences within about 6 km of Section 28: all are sand-and-gravel pits in pediment gravels (Utah Department of Highways pits 04024, 04025 and 04026 northeast of the Wellington rodeo ground, the Wellington NE and NW gravel pits, and the Soldier Creek upper gravel pits), described as road metal, riprap and aggregate. The CRIB mineral-location layer adds one carbon dioxide occurrence. Federal law says no deposit of common varieties of sand, stone or gravel is a valuable mineral deposit under the mining laws unless it has a distinct and special value (30 U.S.C. 611), and carbon dioxide is obtained by lease, not by claim. No vein or lode deposit of a locatable mineral is on record there in these databases. A lode claim requires a vein or lode discovered within it (Utah Code 40-1-1; dir-004). Absence from these databases does not prove no mineral exists.
- Utah mineral occurrence records (UGRC 'Minerals'; USGS/UGMS records) within about 6 km of Section 28 (Utah Geospatial Resource Center (USGS / Utah Geological and Mineral Survey records)) primary government
- Utah mineral locations (CRIB) within about 6 km of Section 28 (Utah Geospatial Resource Center) primary government
- 30 U.S.C. 611 (common varieties not valuable mineral deposits) (Legal Information Institute (Cornell), text of the U.S. Code) primary government “No deposit of common varieties of sand, stone, gravel”
Every claim in BLM's not-closed mining-claim layer that intersects Carbon County was pulled on 2026-09-29: ten open claims (AMBERIA 1-9 in T14S R9E, BLACK RIFLE placer in T15S R11E), none RW and none naming Valar (mine-002). A second check the same day, by legal description, found no claim, open or closed, anywhere in T14S R11E (the township of both the lease and RW 453), and no Utah claim named RW among the 134 Utah claims BLM created from September 12 to September 29. Federal rules require recording with BLM by the 90th day after location (43 CFR 3833.11), so RW 453 (located Sept 12, 2026) is due by December 11, 2026 and may simply not be filed yet.
- BLM National MLRS Mining Claims layers (not closed and closed), Carbon County and T14S R11E queries of 2026-09-29 (Bureau of Land Management, 2026-09-29) primary filing
- 43 CFR 3833.11 (Legal Information Institute (Cornell)) primary government “by the 90th day after the date of location”
Carbon County's own zoning map service (the county's 'County Zoning' layer, queried 29 September 2026 at the center of each area) shows: Section 16, T14S R11E, Valar's Wellington lease, zoned M&G, 'Mining and Grazing Zone' (matching the Trust Lands memo, csite-015); the NW quarter of Section 28, where the RW 453 notice places the claim, zoned RR-1, 'One-acre Rural Residential Zone', and the NE quarter zoned RR-2.5, 'Two-and-one-half-acre Rural Residential Zone' (the notice names both quarters, fld-002); and both parcels of the 'Jurassic Spark' technology park on the 6 October Planning Commission agenda, Section 36 T14S R11E and Section 2 T15S R11E, zoned M&G (dir-015). County zoning does not govern land the United States owns (Utah Code 17-79-306), and about 37% of Section 28's north half is a federal parcel (dir-002); the rest is private land under the county's zoning. What the county's residential zones allow is set by Carbon's development code, which sits on a county site that refuses our reader.
- Carbon County GIS, CountyGeneralMap/Zoning, layer 3 'County Zoning' (point queries, 29 Sept 2026) (Carbon County) primary government “One-acre Rural Residential Zone”
A spatial query of both BLM claim layers against the Census boundary of Carbon County (pulled 2026-09-29) returned 10 open claims and 1 recently closed claim. Nine are lode claims AMBERIA 1-9 (serials UT106330298 to UT106330306), created in BLM's system on 9 and 13 November 2023, status 'Filed', in T14S R8E-R9E, about 23 km west of the Trust Lands parcel approved for leasing to Valar (Sec. 16, T14S R11E, see mine-010). The tenth is the placer claim BLACK RIFLE (UT106782094), created 11 February 2026, status 'Filed', mapped to the SW quarter of the NE quarter of Sec. 12, T15S R11E, about 9.4 km south-east of that parcel. An earlier 160-acre placer claim of the same name (UT106369066, created 13 May 2024) in the NE quarter of the same section is now 'Closed'. Claims created since 1 January 2024: 2 (both BLACK RIFLE). No claim name in the county points to Valar, Ward, Valarin or Numenor, and the layer does not show who staked any of them. Distances are between section centroids from BLM's survey grid and the claims' mapped centroids.
- BLM Natl MLRS Mining Claims - Not Closed (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BLM Natl MLRS Mining Claims - Closed (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BOC National County Boundaries Map Service (Census county boundaries served by BLM) (Bureau of Land Management) primary government
- BLM National PLSS CadNSDI, PLSS Section layer (Bureau of Land Management) primary government
The same query for Emery County returned 1,706 open claims (1,390 lode, 316 placer; 563 'Active', 1,143 'Filed') and 354 claims closed within the last year. Claims created in BLM's system since 1 January 2024: 968 still open and 168 closed, 1,136 in all, in 32 name groups. The largest: 'SS' (341 lode claims, January to April 2024, mostly T23S R15E with some in T23S R14E and T22S R15E); 'GP' (90 placer, August 2025, T22S R8E-R9E); 'GREEN' (83 lode, January 2024, all now closed); 'SAB' (71), 'ECC' (70) and 'SWG' (63), lode claims of May to August 2024 in T22S R15E; 'J' (56 lode), 'GRU' (56 placer, August 2025), 'WB' (54 lode); 'BH' (43 lode, February 2026, T18S R10E-R11E) and 'BIG BODY' (31 lode, February-March 2026, T22S R14E). None of the 1,136 names points to Valar or its product names. The public layer shows neither the claimants nor the mineral sought.
- BLM Natl MLRS Mining Claims - Not Closed (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BLM Natl MLRS Mining Claims - Closed (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BOC National County Boundaries Map Service (Census county boundaries served by BLM) (Bureau of Land Management) primary government
Querying both BLM layers for Utah serial numbers created on or after 29 September 2025 returned 7,139 open and 186 closed claims (7,325). Of the open ones 5,872 are lode, 1,260 placer and 7 mill sites; their dispositions are 'Filed' (7,089), 'Under Review' (27), 'Active' (12) and 'Draft' (11); all 186 closed ones are lode. Assigning each claim's mapped centroid to a county: lode claims are most numerous in Beaver (1,570), Millard (944), Washington (812), Tooele (670), Box Elder (590), Juab (419), Iron (250) and San Juan (196); Emery has 76 (all lode) and Carbon has none (its one new claim is a placer). 73 open claims have no mapped geometry. Emery's 76 are the BH (43, February 2026), BIG BODY (31, February-March 2026) and WF (2, March 2026) blocks; its 53 closed ones (GV 36 and WHEAL ANNE 16, filed October 2025, and FT 1, January 2026) were filed and closed within the year. The 38 labelled 'Draft' or 'Under Review' are in Garfield (11 Draft), Tooele (8), Iron, Piute, Utah and Wasatch counties, or not yet located (15); none is in Carbon or Emery. No new Utah claim carries a Valar-related name (mine-005).
- BLM Natl MLRS Mining Claims - Not Closed (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BLM Natl MLRS Mining Claims - Closed (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BOC National County Boundaries Map Service (Census county boundaries served by BLM) (Bureau of Land Management) primary government
Name searches of both claim layers nationwide (open claims, and claims closed within the last year) for VALAR, VALARIN, NUMENOR, WINDLORD, WARD 250, WARD ZERO, WARD ONE, WARD 1 and WARD250 returned only unrelated names: VALARIE QUEEN (Nevada) and WARD 1 (Nevada), both old claims carried into BLM's new system in January 2021; Ward 1 (Montana, filed 16 September 2026); GOLDEN REWARD 1 (Washington); Sweet Reward 1 (Idaho); and a closed WESTWARD 1 (Colorado). In Utah the only claim name containing WARD is EDWARD PEARL (an old claim carried over in 2021). BLM's public 3809 notice, plan-of-operations and lease/permit/easement layers show no case with Valar as customer anywhere; the only Valar records are three rights-of-way applications (mine-006).
- BLM Natl MLRS Mining Claims - Not Closed (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BLM Natl MLRS Mining Claims - Closed (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BLM Natl MLRS Locatable Notices (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BLM Natl MLRS Plans of Operations (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BLM Natl MLRS Leases, Permits, and Easements (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BLM Natl MLRS Rights of Way (ROW) (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
The Green River Gigasite application (UTUT106784007) lists 22 sections: T20S R14E secs. 24-25; T20S R15E secs. 19-21, 25-31 and 33-35; T21S R15E secs. 1, 3-5 and 12; T21S R16E secs. 5-6. None of the 2,060 Emery County claims in either BLM claim layer (open, or closed within the year) lists any of those sections. The nearest claim activity is in other sections of the same and neighboring townships (e.g. the GFU placers in T21S R15E and GRU placers in T21S R16E, August 2025). The application skips sections 32 and 36 of T20S R15E and section 2 of T21S R15E.
- BLM Natl MLRS Rights of Way (ROW) (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BLM Natl MLRS Mining Claims - Not Closed (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BLM Natl MLRS Mining Claims - Closed (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
Checking each route to a reactor site against the record: the Carbon site is state trust land that Trust Lands approved leasing to Valar (mine-010, mine-011), where federal claims cannot be staked (mine-021); the Green River and 'Project Beehive' sites are FLPMA land-use applications to BLM (mine-006), with no claims in the Green River footprint (mine-007); the Emery expansion is a land purchase from Emery County (mine-018); the test reactor sits on the state's lab by agreement (orig-045). No mining claim, 3809 notice or plan of operations in BLM's public layers is linked to Valar by name or customer (mine-005, mine-030). Federal law allows an unpatented claim to be used only for prospecting, mining or processing (mine-022, mine-023). Separately, the posted notice shows Valar located the RW 453 lode claim in Section 28, two miles south of the lease, on 12 September 2026 (fld-002, csite-019); it is not yet in BLM's layers, which is within the 90-day filing window (dir-005).
- BLM Natl MLRS Rights of Way (ROW) (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BLM Natl MLRS Mining Claims - Not Closed (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- 8.20.2026 TLA Board Packet (Discussion Item 9A: SULA 2095 OBA, Board Meeting Discussion Memorandum) (Utah Trust Lands Administration (Utah Public Notice Website), 2026-08-20) primary government
- 30 U.S.C. 612: Restrictions and limitations on use of unpatented mining claims (Surface Resources Act) (Office of the Law Revision Counsel, U.S. House, 1955-07-23) primary government
Queries of BLM's public MLRS layers for 'VALAR' in the customer or case name returned 0 locatable-mineral notices, 0 plans of operations and 0 leases/permits/easements nationwide, and 3 rights-of-way cases (mine-006). The layers include pending and authorized cases.
- BLM Natl MLRS Locatable Notices (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BLM Natl MLRS Plans of Operations (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BLM Natl MLRS Leases, Permits, and Easements (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BLM Natl MLRS Rights of Way (ROW) (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
BLM's Surface Management Agency map, queried at the centers of the surrounding sections of T14S R11E on 29 September 2026, shows Section 16 managed by the State and Sections 10, 15, 17, 20, 21 and 22 managed by BLM (Sections 8 and 9 were not returned by the survey-grid query). The lease map in the September Trust Lands packet shows the parcel with a legend of Bureau of Land Management, private and state trust lands. The surrounding BLM land is the kind of land where federal mining claims can be staked unless it has been withdrawn; BLM's public claim layer shows none there (mine-002).
- BLM National Surface Management Agency (SMA), limited scale, layer 1 (point queries) (Bureau of Land Management) primary government
- BLM National PLSS CadNSDI, PLSS Section layer (Bureau of Land Management) primary government
- 09.17.2026 TLA Board Packet (Notification Item 10A: SULA 2095-OBA memorandum, Carbon County letter, lease map) (Utah Trust Lands Administration (Utah Public Notice Website), 2026-09-17) primary government
The Trust Lands memorandum says HALEU, LEU+ or LEU feedstock may be delivered to the Carbon site in certified special-nuclear-material containers under NRC, DOT and DOE rules and made into TRISO fuel there. POWER magazine's 19 June 2026 report on Ward 250 noted Utah hosts the nation's only fully licensed operating conventional uranium mill, but said it would add details on fuel sourcing later. POWER's report on DOE's second round of HALEU allocations (27 August 2025) names Antares, Standard Nuclear and Abilene Christian University/Natura as recipients; it mentions Valar only as a Reactor Pilot Program participant. No record read names the supplier of Ward 250's fuel or of Valar's planned feedstock, and none links it to Utah mines or mills. The claims staking in Emery County (mine-003) and the uranium exploration notices there (mine-029) show no link to Valar.
- 8.20.2026 TLA Board Packet (Discussion Item 9A: SULA 2095 OBA, Board Meeting Discussion Memorandum) (Utah Trust Lands Administration (Utah Public Notice Website), 2026-08-20) primary government “feedstock may be delivered to the site in certified Special Nuclear Material (SNM) containers”
- Valar Atomic's Ward 250 Becomes Second Reactor to Go Critical Under DOE Pilot Program (POWER (Sonal C. Patel), 2026-06-19) news
- DOE Allocates Second Round of HALEU Fuel to Three U.S. Nuclear Companies (POWER (Sonal C. Patel), 2025-08-27) news
Built or operating: Ward 250 and its fuel lab at the San Rafael lab, Emery County (plan-002); the company's design, machining and test shops in Hawthorne/Torrance, California (plan-008). Used once: the NOVA test core at the National Criticality Experiments Research Center, Nevada, operated by Los Alamos in November 2025 (orig-008). Being acquired: the 112-acre Emery County parcel beside the lab (gov-022, loc-014). Lease approved: on 17 September 2026 the state trust-lands board approved a lease with purchase option for 480 acres of the section north of Wellington, with the other 160 acres to follow if the National Guard's lease there is moved (mine-011, plan-016); no record read shows the lease signed. Applied for: three Bureau of Land Management cases, all in the Price Field Office, all 'Pending' on 29 September 2026: UTUT106784007 'Green River Gigasite Small Modular Reactor/Data Center' (10,270.61 acres, filed 13 February 2026, which Valar told The Washington Sun it no longer pursues, mine-008), UTUT106801248 'Project Beehive Small Modular Reactor/Data Center' (case date 13 April 2026, no acreage shown), and UTUT106833224, a distribution-line case with no name (entered 23 July 2026). NPR reported on 30 September 2026, citing a Valar proposal to federal regulators that NPR reviewed, that Project Beehive would cover over 9,000 acres of BLM land near Price with data centers, some 456 small reactors of 25 megawatts of electricity each, a fuel facility and nuclear-waste storage, with the first reactors in 2028; BLM's Utah office told NPR it had received an application and was reviewing it for completeness. The proposal itself was not found in public records. No BLM rights-of-way case names Valar outside Utah, and its other public layers show no Valar claims, notices, leases or permits (mine-005, mine-030). Program: NRIC's August 2026 Launch Pad round includes Valar; POWER describes Ward 250 and the Valarin facility (gov-010). Abroad: Ward One in the Philippines, announced March 2025 and still unbuilt and without an approved site as of the last report read (orig-064). Valar says it looked at more than 20 states (ppl-006, loc-001); no site in another state was found in any public record read.
- BLM National MLRS Land Use Authorizations - Rights-of-Way (query: customer name contains 'VALAR', run 2026-09-29) (U.S. Bureau of Land Management, 2026-09-15) primary government “Green River Gigasite Small Modular Reactor/Data Center”
- Castle Country (Valar Atomics, 2026-09) primary company
- Board of Trustees Meeting slides, August 20, 2026 (SULA 2095 Other Business Arrangement) (Utah Trust Lands Administration, via Utah Public Notice Website, 2026-08-20) primary government “Selected by Valar Atomics following multi-state search”
- A startup wants to build a massive nuclear-powered data center on public land in Utah (NPR, 2026-09-30) news “some 456 small nuclear reactors”
Emery County's 17 February 2026 agenda listed an MOU letting Valar do site-suitability testing on parcel 04-0019-0030 (orig-046). Utah's statewide parcel layer (UGRC, Emery County assessor data current as of 17 July 2024) shows that parcel as 112.7 acres, north-west of Orangeville; its centre lies within about 0.5 km of the other parcels in the same 04-0019 block. Valar said on 20 August 2026 that it was buying about 110 acres north of the lab from Emery County (mine-018). The sizes match, but no record read says the purchase is this parcel; the layer carries no owner names or addresses and predates any sale.
- Parcels_Emery_LIR (Utah statewide parcels, land information records) (Utah Geospatial Resource Center (UGRC), 2024-07-17) primary government
- Emery County Commission Meeting (notice, February 17, 2026) (Utah Public Notice Website (Emery County Commission), 2026-02-17) primary government “allowing them to perform site suitability testing on parcel 04-0019-0030”
- 2026-08-20 TLA Board of Trustees Meeting Audio Transcript (auto-generated) (Utah Trust Lands Administration (Utah Public Notice Website), 2026-08-20) primary government “currently purchasing 110 acres north of the lab from Emery County”
Of the 7,139 open Utah claims filed in the last 12 months, 70 have neither a map shape nor a legal description in the public layer, so their county cannot be told. They include 30 lode claims 'DOME HILL #' (UT106842998 to UT106843027, all created 28 August 2026, 'Filed'); 19 claims created 25 September 2026 named Bromide, COPPER KING, COPPER CREEK, PROSPECTORS DREAM and KIMBALL & TURNER (serials UT106849937 to UT106849973; 13 'Under Review', 6 'Filed'); and small groups from 29 September 2025 to July 2026 (SALT CREEK, SM, CC, HATCHS HAUL and single claims). None of the names points to Valar. Until BLM adds their legal descriptions, any of them could lie in Carbon County.
- BLM Natl MLRS Mining Claims - Not Closed (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
The Washington Sun (Mara Hoplamazian and Jade Lozada, published and updated 18 September 2026) reported that the largest data-center proposal it found on BLM land 'appears to be' a 10,200-acre project from Valar Atomics at a site near Green River, Utah, and that Valar had a second Utah proposal it called the 'Raceway Gigasite', with no estimated size. An editor's note added after publication says Valar contacted the paper, confirmed it had applied 'for survey access' at the 10,200-acre site, and that a company spokesperson said it had decided not to pursue the project. On 29 September 2026 BLM's public layer still showed UTUT106784007 as 'Pending' (last modified 26 May 2026) and titled for a reactor and data center, not a survey. No BLM case named 'Raceway' appears in any public MLRS layer; the only other Valar case with a site name is 'Project Beehive' (mine-006). Whether 'Raceway' and 'Beehive' are the same site is not shown in any record read.
- Trump Is Considering More Data Centers on Public Lands Than Previously Known (The Washington Sun (Mara Hoplamazian and Jade Lozada), 2026-09-18) news “After considering the site, the company has decided to no longer pursue the project”
- BLM Natl MLRS Rights of Way (ROW) (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing “Green River Gigasite Small Modular Reactor/Data Center”
A Notice of Location is posted at one of the claim markers (fld-001, fld-002; the photo was re-read for this check). It names Valar Atomics Inc as locator of the 'RW 453' Lode Mining Claim in the NW and NE quarters of Section 28, T14S R11E, Salt Lake Principal Meridian, Carbon County, located on the 12th (handwritten) of September 2026. Section 28 lies two sections (about two miles) south of Section 16, which the state approved leasing to Valar, in the same township. A fresh query of BLM's not-closed mining-claim layer on 29 September 2026 still shows only 10 open claims in Carbon County, none named RW or Valar; the nearest, the BLACK RIFLE placer (UT106782094), is about 9.4 km south-east of Section 16 (mine-002). That absence is expected for now: federal rules allow 90 days after location to record a claim with BLM (dir-005), and Utah law requires a copy of the notice to be recorded with the county recorder within 30 days of posting, about 12 October 2026 for RW 453 (mine-026, dir-004). The number 453 suggests a series, but one notice does not show how many claims exist. Section 16 itself is state trust land, which federal mining claims cannot cover (mine-021, mine-034); county parcel records show part of Section 28 is federal (dir-002). The notice does not name a mineral; the only mineral occurrences on record nearby are gravel pits and carbon dioxide (dir-003, disc-003). Other sources of stakes exist nearby: easements and a Guard lease on Section 16 (csite-003), Valar's own site surveys allowed under the lease (mine-015), and PacifiCorp's pending transmission line, which crosses sections 19, 29, 30, 34 and 35 of the township (mine-049). BLM's rights-of-way layer shows Valar's three pending cases unchanged (Green River, Beehive, and UTUT106833224, which BLM lists as a pending distribution line with no location; mine-006). Of the 7,139 Utah claims created in the 12 months to 29 September 2026, 77 still had no legal description on BLM's layer, so new claims can take time to appear.
- Photo of the Notice of Location posted at the RW 453 location monument (resident fieldwork, 2026-09) resident fieldwork “Valar Atomics Inc”
- BLM Natl MLRS Mining Claims - Not Closed (feature layer; envelope query around Carbon County) (Bureau of Land Management (MLRS)) primary filing
- BLM Natl MLRS Rights of Way (feature layer; query by customer name) (Bureau of Land Management (MLRS)) primary filing “Green River Gigasite Small Modular Reactor/Data Center”
- 43 U.S.C. 1744: Recordation of mining claims (Office of the Law Revision Counsel, U.S. House) primary government “within ninety days after the date of location of such claim”
- Utah Code 40-1-4: Copy of location notice to be recorded (Utah State Legislature) primary government “Within 30 days after the date of posting the location notice upon the claim”
- 30 U.S.C. 612: Unpatented mining claims (Office of the Law Revision Counsel, U.S. House) primary government “for any purposes other than prospecting, mining or processing operations”
The Notice of Location posted at the claim's location monument reads: locator Valar Atomics Inc, 20333 Normandie Ave, Torrance, CA 90501; the 'RW 453' Lode Mining Claim in quarter sections NW and NE of Section 28, Township 14S, Range 11E, Salt Lake Principal Meridian, Carbon County, Utah; located on the 12th day of September 2026 (the day written by hand). The claim is about 1,500 by 600 feet (1,490 feet east and 10 feet west of the monument, 300 feet each side), which is the largest size a single lode claim may take. It ties the claim's NW corner to the permanent monument at the SE corner of Section 32 (see dir-001 for a problem with that tie). The number 453 suggests a numbered series of claims, but one notice does not show how many exist; BLM's public layer does not list any RW claim yet (dir-005).
- Photo of the Notice of Location posted at the RW 453 location monument (resident fieldwork, 2026-09) resident fieldwork “Valar Atomics Inc”
The RW 453 notice (fld-002) ties the claim's NW corner to the permanent monument at the SE corner of Section 32, T14S R11E: 'approximately 8179 feet at an azimuth of 265.3 degrees'. BLM's survey grid puts that corner at about 39.5570 N, 110.7025 W. An azimuth of 265.3 degrees is almost due west; 8,179 feet that way ends near 39.555 N, 110.73 W, about two miles from Section 28, which lies to the north (39.572-39.586 N). The same distance at about 5 degrees (nearly due north) lands in Section 28's north half (39.579 N, 110.700 W), so the bearing looks like an error. This is Claude's calculation from the notice and BLM's section geometry, not a survey.
- Photo of the Notice of Location posted at the RW 453 location monument (resident fieldwork, 2026-09) resident fieldwork
- BLM National PLSS (CadNSDI) sections layer: SE corner of Section 32, T14S R11E SLM (queried 2026-09-29) (Bureau of Land Management, 2026-09-29) primary government
- Utah Code Title 40, Chapter 1, Mining Claims (40-1-1 to 40-1-12) (Utah State Legislature, 2025-05-07) primary government “No location of a mining claim shall be made until the discovery of the vein or lode”
The Utah Trust Lands Administration's 20 August 2026 board memorandum (Discussion Item 9A) names the applicant as Valar Atomics Inc. and the land as T14S, R11E, Section 16, 640 acres of state trust land about five miles north of Wellington, benefiting the Public Schools Trust. It confirms that the Special Use Lease Agreement 'SULA 2095 OBA' on the August agenda (orig-044) is this parcel. The stated purpose is an integrated nuclear energy, advanced manufacturing, critical mineral refining and data center campus: developing, manufacturing and operating high-temperature gas-cooled reactors (HTGRs) for power, plus possible TRISO fuel manufacturing, concrete batch plants, component manufacturing, hydrogen and synthetic fuels, data centers, water desalination and steel making. It is an 'Other Business Arrangement' because it includes an option to buy the land. Staff at the meeting described the site as about six miles east of Price and said Valar chose it after a multi-state search.
- 8.20.2026 TLA Board Packet (Discussion Item 9A: SULA 2095 OBA, Board Meeting Discussion Memorandum) (Utah Trust Lands Administration (Utah Public Notice Website), 2026-08-20) primary government “an integrated nuclear energy, advanced manufacturing, critical mineral refining, and data center computing campus”
- 2026-08-20 TLA Board of Trustees Meeting Audio Transcript (auto-generated) (Utah Trust Lands Administration (Utah Public Notice Website), 2026-08-20) primary government
Right-of-entry permit application 7675 (Trust Lands permit map, 18 February 2026) covers nearly all of Section 16, T14S R11E, SLB&M, north of Wellington: 634.32 acres (the map leaves out a small southeast corner). Trust Lands' map for Special Use Lease Agreement No. 2095, produced 9 April 2026 and posted by the RDCC on 20 April 2026 as a 'Lease Agreement with possible option to purchase' (project 87203), covers the north half and southwest quarter of the same section: 480 acres. The Trust Lands board memorandum says the Utah National Guard's lease, SULA 1321, occupies the section's southeast quarter (160 acres). The board approved SULA 2095 with Valar Atomics on 17 September 2026, per the meeting transcript (mine-011). No record read names the applicant for 7675 or shows the permit was issued.
- Right of Entry No. 7675 - Geotechnical Survey (permit map) (Utah Trust Lands Administration (via the RDCC project register), 2026-02-18) primary government “Right of Entry No. 7675 - 634.32 Acres”
- Special Use Lease Agreement No. 2095 (lease map) (Utah Trust Lands Administration (via the RDCC project register), 2026-04-09) primary government “N2, SW4 - Section 16 - 480 Acres”
- RDCC project register: projects 87096-87099 (Right-of-Entry Permits #7672, #7674, #7675, #7676) and 87203 (SULA 2095) (Utah Resource Development Coordinating Committee (Public Lands Policy Coordinating Office), 2026-02-19) primary government “to evaluate the feasibility of a potential industrial and manufacturing development”
- 09.17.2026 TLA Board Packet (Notification Item 10A: SULA 2095 OBA memorandum) (Utah Trust Lands Administration, 2026-09-14) primary government “The UNG lease (SULA 1321) occupies 160 acres of the 640-acre section”
BLM's public rights-of-way layer (queried 29 September 2026) shows PacifiCorp as applicant on a pending 'Power Transmission Line' case, UTUT106794107 (created 6 April 2026; 14,262 acres of mapped legal area), whose legal description runs from T13S R10E in Carbon County south-east through Emery County to T25S R21E. It includes parts of sections 19, 29, 30, 34 and 35 of T14S R11E, the township that holds Section 16 (approved for leasing to Valar); those sections' centres lie roughly 2 to 4 miles from the centre of Section 16. In the township directly north (T13S R11E) and in T13S R10E, Urban Oil & Gas Group LLC has eight road, pipeline and water-facility rights-of-way whose records were created in August 2026 (seven 'Authorized', one road 'Pending'). The other new Carbon County cases since June 2025 are a PacifiCorp distribution line (T13S R7E), a Price City water facility (T12S R9E) and a Union Pacific communications site (T13S R10E). No record read links any of these to Valar.
- BLM Natl MLRS Rights of Way (ROW) (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BLM National PLSS CadNSDI, PLSS Section layer (Bureau of Land Management) primary government
On 19 February 2026 the state's Resource Development Coordinating Committee (RDCC) posted four applications for Trust Lands right-of-entry (site-study) permits as projects 87096 to 87099, numbered 7672, 7674, 7675 and 7676. Comments were due 3 March and the stated start was 6 March. Each notice says that Trust Lands 'has received a Right-of-Entry (ROE) permit application' for cultural-resource surveys, geotechnical investigations and similar studies 'to evaluate the feasibility of a potential industrial and manufacturing development', and that 'No permanent development is proposed under the Right-of-Entry authorization.' Trust Lands' permit maps, dated 18 February 2026, give the areas: 7672, 1,812.94 acres near Green River (T20S R15E and T21S R15-16E, Emery County); 7674, 5,381.59 acres south and west of Price (T14-15S R9-10E, Carbon County); 7675, 634.32 acres, nearly all of Section 16, T14S R11E, north of Wellington (Carbon County; the map leaves out a small southeast corner); 7676, 487.83 acres in Sections 2 and 16, T16S R13E (Emery County). That is 8,316.68 acres in all. The notices record that local governments were contacted on 19 February. The only state comments were Division of Wildlife Resources recommendations of 3 March 2026: three of the areas are crucial year-long pronghorn habitat; white-tailed prairie dogs, burrowing owls and kit foxes could occur; and hawks are known to nest near two of the areas. No applicant is named in the four notices, the four maps or the comment letters, and no record read shows the permits were issued: the register lists all four as 'State Comment Published'.
- RDCC project register: projects 87096-87099 (Right-of-Entry Permits #7672, #7674, #7675, #7676) and 87203 (SULA 2095) (Utah Resource Development Coordinating Committee (Public Lands Policy Coordinating Office), 2026-02-19) primary government “to evaluate the feasibility of a potential industrial and manufacturing development”
- Right of Entry No. 7672 - Geotechnical Survey (permit map, file ROE_7672_SULA_1622_02182026.pdf) (Utah Trust Lands Administration (via the RDCC project register), 2026-02-18) primary government “Right of Entry No. 7672 - 1,812.94 Acres”
- Right of Entry No. 7674 - Geotechnical Survey (permit map) (Utah Trust Lands Administration (via the RDCC project register), 2026-02-18) primary government “Right of Entry No. 7674 - 5,381.59 Acres”
- Right of Entry No. 7675 - Geotechnical Survey (permit map) (Utah Trust Lands Administration (via the RDCC project register), 2026-02-18) primary government “Right of Entry No. 7675 - 634.32 Acres”
- Right of Entry No. 7676 - Geotechnical Survey (permit map) (Utah Trust Lands Administration (via the RDCC project register), 2026-02-18) primary government “Right of Entry No. 7676 - 487.83 Acres”
- Public Lands Policy Coordinating Office letter on Right-of-Entry Permit #7674 (Division of Wildlife Resources comments) (Utah Public Lands Policy Coordinating Office, 2026-03-03) primary government “within crucial year-long pronghorn habitat”
Right-of-entry permit application 7672 (1,812.94 acres; Trust Lands permit map, 18 February 2026) lies within Sections 32 and 36 of T20S R15E, Sections 10 and 11 of T21S R15E and Section 6 of T21S R16E, near Green River in Emery County. The permit map file is named for, and draws beside it, Special Use Lease Agreement No. 1622 (2,441.03 acres); no record read names that lease's holder. Overlaid on BLM's case map for Valar's pending 'Green River Gigasite' right-of-way application (UTUT106784007), Section 32 of T20S R15E lies wholly inside the application's outer boundary and is the only hole in the case map (about 637 acres): state land the application surrounds. The case map also covers about 467 acres of Section 6, T21S R16E (the part that is not state land); the permit application's state land there lies outside it. Sections 36, 10 and 11 lie outside it; they border it, but no part falls inside it. No record read names the applicant for 7672 or shows the permit was issued. BLM still lists Valar's application as pending; Valar told a reporter it has decided not to pursue the site (mine-008).
- Right of Entry No. 7672 - Geotechnical Survey (permit map, file ROE_7672_SULA_1622_02182026.pdf) (Utah Trust Lands Administration (via the RDCC project register), 2026-02-18) primary government “Right of Entry No. 7672 - 1,812.94 Acres”
- BLM Natl MLRS Rights of Way: case UTUT106784007, 'Green River Gigasite Small Modular Reactor/Data Center' (case map) (Bureau of Land Management (MLRS)) primary filing “Green River Gigasite Small Modular Reactor/Data Center”
- BLM PLSS CadNSDI first division (sections) for the listed townships (Bureau of Land Management (Cadastral National Spatial Data Infrastructure)) primary government
- RDCC project register: projects 87096-87099 (Right-of-Entry Permits #7672, #7674, #7675, #7676) and 87203 (SULA 2095) (Utah Resource Development Coordinating Committee (Public Lands Policy Coordinating Office), 2026-02-19) primary government “to evaluate the feasibility of a potential industrial and manufacturing development”
- Trump Is Considering More Data Centers on Public Lands Than Previously Known (The Washington Sun (Mara Hoplamazian and Jade Lozada), 2026-09-18) news “After considering the site, the company has decided to no longer pursue the project”
BLM's public rights-of-way layer lists Valar Atomics as 'Applicant' on three pending cases, all filed with the Price Field Office (the office that handles most rights-of-way cases in Carbon and Emery counties in the same layer): (1) UTUT106784007, 'Green River Gigasite Small Modular Reactor/Data Center', a FLPMA land-use case, 'Pending' since 13 February 2026 (last modified 26 May 2026), 10,270.61 acres in T20S-T21S, R14E-R16E, north-west of the town of Green River in Emery County; (2) UTUT106801248, 'Project Beehive Small Modular Reactor/Data Center', 'Pending' (disposition date 13 April 2026, record created 30 April, last modified 15 September 2026), with no land description or map in the public layer; (3) UTUT106833224, filed under BLM's 'Oil and Gas Pipelines' product with the commodity 'DISTRIBUTION LINE', created 23 July 2026, 'Pending', also with no land shown and no case name. None of the three involves mining claims. No Federal Register notice naming Valar for any of them was found (mine-009).
- BLM Natl MLRS Rights of Way (ROW) (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing “Green River Gigasite Small Modular Reactor/Data Center”
The Utah Geological Survey's 'Utah mining 2024' (Circular 139, 2025) says Energy Fuels is the only uranium producer in Utah, having restarted its Beaver, La Sal and Pandora mines in early 2024 (29,780 tons of ore worth about $13 million), and that its mill outside Blanding is the only conventional uranium mill in the United States; not all the uranium it processes is from Utah ore. It lists the Velvet-Wood mine near Monticello (plan approved in early June 2025 after a federal fast-track), Anfield's plan to restart the Shootaring Canyon mill near Ticaboo in 2027, IsoEnergy's Tony M project and the Harts Point exploration project. None is in Carbon or Emery County. Utah DEQ licenses the White Mesa mill (license UT1900479) since Utah became an Agreement State for uranium mills in August 2004.
- Utah mining 2024: Metals, industrial minerals, uranium, and coal (Circular 139) (Utah Geological Survey, 2025) primary government “Energy Fuels is currently the only uranium producer in Utah.”
- White Mesa Uranium Mill: Energy Fuels Resources (USA) Inc. (Utah Department of Environmental Quality) primary government
ETV News (Susanna Watts, 10 October 2025) reported that the Utah Office of Energy Development bought the San Rafael Energy Lab in July 2024 after Emery County had run it for two years, that Valar's buildings were going up on an 11-acre allotment there, and that Valar must show that under worst-case conditions no damage or radiation passes the fence line of those 11 acres. At the Trust Lands hearings the Office of Energy Development's deputy directors said their office owns and operates the lab and that Valar is its tenant on state land. Valar later said it was buying about 110 acres north of the lab from Emery County (mine-018).
- What's actually happening at the Utah San Rafael Energy Lab? (ETV News (Susanna Watts), 2025-10-10) news “Their buildings are currently under construction in their 11-acre allotment.”
- 2026-08-20 TLA Board of Trustees Meeting Audio Transcript (auto-generated) (Utah Trust Lands Administration (Utah Public Notice Website), 2026-08-20) primary government “the state agency that is that owns and operates the San Rafael Energy Lab”
BLM's public layers show 7 notice-level and 7 plan-level locatable-mineral cases in Emery County and none in Carbon. Of the 7 notices, 5 are for 'URANIUM AND OTHER MIN': PINON RIDGE BUCKMASTER (Pinon Ridge Mining LLC, authorized 2024), PEGASUS (ENERGY SANDS & JUPITER) (Pegasus Resources Inc, pending, 2024), SAHARA GREEN RIVER SOUTH (San Rafael Resources LLC, authorized 2024), 'MELINDA EXPLORATION PROJECT' (UTUT106713795, operator C2C NUCLEAR INC, created 24 January 2025, 640 acres mapped in T23S R15E, 'Pending'), and an unnamed notice (UTUT106721750, created 7 March 2025, T24S R10E, no operator shown, 'Pending'). The others are Georgia-Pacific Gypsum's 2025 gypsum exploration notice (authorized 13 June 2025) and an old rock notice. The 7 plans include the Kimmerle Green River #9 uranium plan (authorized 2015), gypsum quarries including the pending 'Powell Gypsum Quarry' (UTUT106759404, created 18 November 2025, T19S R11E), and gemstone and shale operations. The C2C notice sits in the same township as most of the 341 'SS' lode claims of 2024 (mine-003). No record read links any of these operators to Valar.
- BLM Natl MLRS Locatable Notices (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing “MELINDA EXPLORATION PROJECT”
- BLM Natl MLRS Plans of Operations (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
Utah Code 40-1-2 requires the locator to erect a monument at the place of discovery and post on it a notice of location giving the claim's name, the names of the locators, the date of location, and its size and description tied to a natural object or permanent monument. Utah Code 40-1-3 requires the claim's boundaries to be distinctly marked on the ground so they can be readily traced. Utah Code 40-1-4 requires a substantial copy of the notice to be recorded with the county recorder of the county where the claim lies within 30 days of posting.
- Utah Code 40-1-2: Discovery monument -- Notice of location -- Contents (Utah State Legislature, 2024-05-01) primary government “must erect a monument at the place of discovery”
- Utah Code 40-1-3: Boundaries to be marked (Utah State Legislature) primary government “distinctly marked on the ground so that the boundaries thereof can be readily traced”
- Utah Code 40-1-4: Copy of location notice to be recorded (Utah State Legislature) primary government “record a substantial copy of the notice of location”
43 U.S.C. 1744 (FLPMA sec. 314) requires a claim's owner, for any claim located after 21 October 1976, to file a copy of the recorded location notice with BLM within ninety days of location, and to file each year, before 31 December, in both the county office where the location notice is recorded and BLM's designated office. Failing to file is deemed conclusively to be abandonment of the claim.
- 43 U.S.C. 1744: Recordation of mining claims (FLPMA sec. 314) (Office of the Law Revision Counsel, U.S. House, 1976-10-21) primary government “shall be deemed conclusively to constitute an abandonment of the mining claim”
30 U.S.C. 612(a) (Surface Resources Act of 23 July 1955) says a mining claim located after that date may not be used, before a patent is issued, for any purpose other than prospecting, mining or processing and uses reasonably incident to them. Subsection (b) keeps the United States' right to manage the surface and let others use it, so long as that does not materially interfere with mining.
- 30 U.S.C. 612: Restrictions and limitations on use of unpatented mining claims (Surface Resources Act) (Office of the Law Revision Counsel, U.S. House, 1955-07-23) primary government “for any purposes other than prospecting, mining or processing operations”
A 1957 USGS report for the Atomic Energy Commission (H. S. Johnson Jr., Bulletin 1046-D) says uranium ore in the San Rafael district of Emery County was first reported in 1914 at Temple Mountain, on the east flank of the Swell; the deposits were mined for radium, and possibly vanadium, during World War I and intermittently to 1942; geologists studied Temple Mountain for the Manhattan Engineer District during World War II; production rose quickly after the war; and from 1952 to 1956 output came mainly from the Temple Mountain deposits and Vernon Pick's Delta mine, with the Lucky Strike and 10 to 15 smaller deposits.
- Uranium Resources of the San Rafael District, Emery County, Utah: a Regional Synthesis (Bulletin 1046-D) (U.S. Geological Survey (H. S. Johnson, Jr.), 1957) primary government “The Temple Mountain deposits were mined for radium and possibly byproduct vanadium”
30 U.S.C. 22, from the Mining Law of 10 May 1872, declares valuable mineral deposits in lands belonging to the United States free and open to exploration and purchase by citizens, under federal law and local mining customs, 'except as otherwise provided'. The statute reaches only land of the United States; the Wellington parcel (Sec. 16) is state trust land (mine-010, mine-034), so a federal mining claim cannot be staked on it.
- 30 U.S.C. 22: Lands open to purchase by citizens (Office of the Law Revision Counsel, U.S. House, 1872-05-10) primary government “all valuable mineral deposits in lands belonging to the United States”
Federal mining law, 30 U.S.C. 23, limits a lode claim to 1,500 feet along the vein and 300 feet each side of it, and says 'no location of a mining claim shall be made until the discovery of the vein or lode within the limits of the claim located'. Utah Code 40-1-1 says the same for Utah. 40-1-2 requires a monument at the place of discovery with the notice on it (claim name, locators, date, feet claimed along the vein each way, width, the general course of the vein, and a tie to a natural object or permanent monument). 40-1-3 requires the boundaries to be distinctly marked on the ground. 40-1-4 requires a substantial copy of the notice to be recorded with the county recorder within 30 days after posting: for RW 453, located September 12, 2026, by about October 12, 2026 (fld-002). 40-1-11 makes it a class B misdemeanor to tear down or deface a posted notice or remove a claim's stakes or monuments. The RW 453 notice therefore amounts to a claim that a vein or lode was discovered in Section 28; no record read says what mineral.
- 30 U.S.C. 23, Length of claims on veins or lodes (Legal Information Institute (Cornell)) primary government “no location of a mining claim shall be made until the discovery of the vein or lode”
- Utah Code Title 40, Chapter 1, Mining Claims (40-1-1 to 40-1-12) (Utah State Legislature, 2025-05-07) primary government “No location of a mining claim shall be made until the discovery of the vein or lode”
BLM publishes its Mineral & Land Records System (MLRS) mining claims as two public ArcGIS layers on gis.blm.gov: 'Mining Claims - Not Closed' and 'Mining Claims - Closed' (read 2026-09-29, no key needed; gis.blm.gov has no robots.txt). Their fields are case name, serial number (e.g. UT106782094), legacy serial, claim type (lode, placer, mill site), disposition (Filed, Active, Under Review, Draft, Closed), acres, a Public Land Survey legal description, and record Created/Modified timestamps. They carry no claimant (owner) name, no location date and no county field. The closed layer holds only claims closed or modified within the last year. BLM's own layer description says claims are usually mapped only to the quarter section, and that the staked boundaries are in the Notice/Certificate of Location in the official case file. By contrast, BLM's public layers for mining notices, plans of operations, rights-of-way and leases do carry a 'Business Account Name' (the customer), which is how Valar's rights-of-way applications were found (mine-006).
- BLM Natl MLRS Mining Claims - Not Closed (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BLM Natl MLRS Mining Claims - Closed (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing “The BLM only requires that mining claims be identified down to the affected quarter section(s)”
- BLM Natl MLRS Locatable Notices (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
BLM's use-and-occupancy rules (43 CFR subpart 3715) limit use of mining claims to what is 'reasonably incident' to prospecting and mining. Occupancy (living on site, structures, watchmen) beyond 14 days in 90 requires ongoing, observable mining work, BLM consultation and BLM's determination before it begins. Prohibited acts include uses not reasonably incident to mining, fences or gates that shut out the public without BLM approval, and blocking public passage by force or intimidation.
- 43 CFR Part 3710, Subpart 3715: Use and Occupancy Under the Mining Laws (2024 edition) (U.S. Government Publishing Office (govinfo), 2024-10-01) primary government “limiting such use or occupancy to that which is reasonably incident”
Under BLM's surface-management rules (43 CFR subpart 3809), exploration disturbing 5 acres or less needs a complete notice filed 15 days before starting (3809.21(a)); casual use with negligible disturbance needs neither. Work over 5 acres, bulk sampling of 1,000 tons or more, or work in special areas needs a plan of operations, and before acting on a plan BLM publishes its availability and takes at least 30 days of public comment (3809.411(c)). The notice rule we read has no public-comment step. Emery County has 7 notices and 7 plans on BLM's public layers and Carbon County none; none is Valar's (mine-030).
- 43 CFR Part 3800, Subpart 3809: Surface Management (2024 edition) (U.S. Government Publishing Office (govinfo), 2024-10-01) primary government “exploration causing surface disturbance of 5 acres or less”
- 43 CFR 3809.411: What action will BLM take when it receives my plan of operations? (2024 edition) (U.S. Government Publishing Office (govinfo), 2024-10-01) primary government “will accept public comment for at least 30 calendar days on your plan of operations”
- BLM Natl MLRS Locatable Notices (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
- BLM Natl MLRS Plans of Operations (feature layer and query results) (Bureau of Land Management (MLRS)) primary filing
Under 43 CFR 2804.25 (2024 edition), BLM tells the applicant in writing when it receives a right-of-way application and the cost-recovery fees; it completes NEPA review, consults tribes and other governments, and then decides. The rule says BLM will hold public meetings if there is enough public interest to warrant them, announced in the Federal Register and by other means such as local newspapers or the internet; for solar and wind projects it must hold a local meeting when there is no other early engagement. Valar's three applications are pending (mine-006) and no Federal Register notice for them was found (mine-009).
- 43 CFR 2804.25: How will BLM process my application? (rights-of-way, 2024 edition) (U.S. Government Publishing Office (govinfo), 2024-10-01) primary government “Hold public meetings if sufficient public interest exists to warrant their time and expense.”
BLM's MLRS page says both old and new serial numbers are searchable and points to its public reports at reports.blm.gov/reports/MLRS. That index lists 'Mining Claims - Customer Info Report', 'Mining Claims - Serial Number Index', 'Mining Claims - Claim Name/Number Index', 'Mining Claims - Geographic Report' and a 'Public Mining Claims Serial Register Page', and notes the public versions carry Privacy Act redactions (unredacted access needs a Login.gov account). The reports themselves (under reports.blm.gov/report/) are disallowed to all robots by BLM's robots.txt, and the MLRS public room (mlrs.blm.gov/s/) is disallowed too and renders only by script, so we did not read them. By hand, a resident can search mlrs.blm.gov by a serial number such as UT106782094, or run the Serial Register Page or Customer Info report at reports.blm.gov with it. Other routes: the Carbon County Recorder, where location notices must be recorded (mine-026), and the notice on the claim post itself.
- Mineral & Land Records System (MLRS) (Bureau of Land Management) primary government
- BLM Reporting Application - Mineral & Land Records System Reports (Bureau of Land Management) primary government “These reports have Privacy Act redactions.”
Map: Emery and Carbon counties
BLM cases naming Valar: 3
From BLM’s public case layers (rights-of-way, leases, mining notices and plans). A new case appears here after BLM publishes it.
| case | name | type | disposition | county | filed with BLM | lat, lon |
|---|---|---|---|---|---|---|
| UTUT106784007 | Green River Gigasite Small Modular Reactor/Data Center | OTHER FEDERAL LAND POLICY AND MANAGEMENT ACT | Pending | 2026-02-13 | 39.0335, -110.2432 | |
| UTUT106801248 | Project Beehive Small Modular Reactor/Data Center | OTHER FEDERAL LAND POLICY AND MANAGEMENT ACT | Pending | 2026-04-30 | ||
| UTUT106833224 | Oil and Gas Pipelines | Pending | 2026-07-23 |
Mining claims in T14S R11E (the lease’s township) or named RW: 0
RW 453 was staked September 12, 2026; federal rules allow 90 days to file it with BLM (by December 11). BLM’s layer shows the filing date, not the claimant.
None filed with BLM yet.
Lode claims located in Utah in the last 12 months: 0
| case | name | type | disposition | county | located | lat, lon |
|---|
Lode claims in Emery and Carbon counties: 0
| case | name | type | disposition | county | located | lat, lon |
|---|