Operations
What is physically happening: construction, fuel, testing, power levels, staffing, deliveries.
Valar publishes one version of the Ward 250 Nuclear Safety Design Agreement (No. 100403, Revision 02, dated October 2025). The Internet Archive holds seven captures of that PDF (7 November 2025; 1 January, 3 March, 5 July, 6 July, 6 August and 18 September 2026); with the live file Valar Watch fetched on 29 September 2026, all eight are byte-identical (the same SHA-256), and each carries the fuel line 'Fuel Enrichment 4.95% U-235 LEU limits'. So the public copy was not revised after DOE's packaging review approved shipping HALEU fuel to Ward 250 (20 May 2026, safe-010) or after the reactor's first criticality (18 June 2026, orig-010). The agreement itself says that if the fuel differs from its specification, the safety assumptions will be updated in the later Preliminary Documented Safety Analysis, of which no public copy was found (safe-007); an updated analysis may exist. The companion Quality Assurance Program Description (No. 100474, Revision 02) is likewise unchanged across its six copies.
- Ward250 Nuclear Safety Design Agreement, No. 100403 Rev 02: Internet Archive copy of 7 Nov 2025 (Valar Atomics (via Internet Archive), 2025-10) primary company “Fuel Enrichment 4.95% U-235 LEU limits”
- Ward250 Nuclear Safety Design Agreement, No. 100403 Rev 02: Internet Archive copy of 18 Sept 2026 (Valar Atomics (via Internet Archive), 2025-10) primary company “Fuel Enrichment 4.95% U-235 LEU limits”
- Ward250 Nuclear Safety Design Agreement, No. 100403 Rev 02 (live file, fetched 29 Sept 2026) (Valar Atomics, 2025-10) primary company
Valar posted its Ward 250 safety agreement (NSDA) and Quality Assurance Program Description on its website on 13 October 2025, each on its own page linking the PDF (orig-071). Valar Watch compared every saved copy of Valar's library page (valaratomics.com/docs): Internet Archive captures of 16 October and 7 and 19 November 2025, and 5 July, 6 August and 25 August 2026, and the live page on 29 September 2026. In none is either safety-paper page among the library's listed posts; the library lists the NRC-lawsuit post, the Project NOVA release and Valar's other announcements. So since they went up, the only safety papers Valar publishes have been reachable only by a direct link (for example from the Ward 250 page's data or from outside reporting), not by browsing Valar's library. The record does not show why they were left unlisted.
- valaratomics.com/docs, Internet Archive captures Oct 2025 to Aug 2026 (Internet Archive (Wayback Machine)) primary company
- Docs (Valar Atomics library), live page read 29 Sept 2026 (Valar Atomics) primary company
- Ward250 Nuclear Safety Design Agreement (Valar library page, unlisted) (Valar Atomics, 2025-10-13) primary company
What holds (as of 29 September 2026): Valar built a 100 kWt test reactor in California and flew it to Emery County unfueled; DOE approved HALEU TRISO fuel for shipment to it from a federal site in Nevada (no public record states what fuel is loaded, disc-004); and DOE announced its zero-power criticality on 18 June 2026, ahead of the July 4 goal and of Valar's own 30 June target (plan-002, plan-004, plan-008, plan-014). A fuel lab stands beside it and is hiring for a pilot TRISO line (plan-015). What rests on the company's word: full power (plan-006; the only data is an unlabeled chart, plan-007), the electricity demonstration's output (ETV reported the reactor at 37% power, plan-010), and the fuel plant's future size (plan-015). Where Valar's own statements clash: full power on 'June 21' in the state's lease memo versus a 10 kWt output announced 22 June (plan-009); a 12-month demonstration in the approved papers versus a permanent base and 'largest' fuel maker in local talks (plan-003, plan-015); a July 4 date still in the future tense on the homepage (plan-019). Where a Valar document and a DOE document differ: the fuel is listed at 4.95% enrichment in Valar's safety agreement but as HALEU (under 20%) in DOE's shipping review (plan-014, disc-001). What is plan only: fleets and 'thousands of reactors per year' (plan-020), a Carbon County campus with no reactor count, size or date (plan-016), a 30 MW NVIDIA data center (plan-010), a turbine program (plan-018), 'one of Valar's first commercial projects' in Utah (plan-011). What has not happened: the Philippine reactor, the gas-fired test heater, fuel from Valar's own line, the Green River gigasite (plan-021). No power buyer, utility contract or military reactor contract is on the record (plan-012, plan-013). Every site on record is in plan-017; every physical movement of reactor and fuel in plan-025.
- Department of Energy Celebrates Second Advanced Reactor Achieving Criticality (U.S. Department of Energy, 2026-06-18) primary government
- Board of Trustees Meeting Materials, September 17, 2026 (SULA 2095-OBA staff memo) (Utah Trust Lands Administration, via Utah Public Notice Website, 2026-09-17) primary government
- Valar Atomics job board (public Greenhouse feed, 92 postings) (Valar Atomics (via Greenhouse), 2026-09-28) primary company
- Announcing our $1B Series B Led By Sequoia (Valar Atomics, 2026-08-04) primary company
Valar's unlisted, unfinished post dated 28 June 2026 says Ward 250 underwent 'extremely rigorous non-nuclear testing' at its headquarters in Hawthorne, California, before it reached Utah, with temperatures above 750 C and pressures over 6 MPa, thermal cycling and transients; the whole reactor system is six high-cube shipping containers. DOE's Fuel Line Pilot Program page lists the company as 'Valar Atomics Inc. (Hawthorne, California)'. On 29 September 2026 its public job board lists 71 of 92 openings in Torrance, California, including a graphite production lead for machining 'reactor components', CNC programmers, machinists, a welding lead for welds to 'nuclear-grade specifications', and eight turbomachinery roles; two posts name Hawthorne as a work base (a Torrance-listed commercial project manager to 'operate in both Hawthorne and Utah', and an Orangeville-listed people-operations director to be based in or relocate to Hawthorne), and a Utah post mentions travel to the 'Los Angeles headquarters'. The Carbon County claim notice carries a Torrance address (orig-036). In short: reactors and their parts are designed, machined and tested in the Los Angeles area; Utah is where they are fuelled and run. Non-nuclear heat tests are not limited by the nuclear safety limits in the NSDA (a 650 C limit versus 750 C goals, disc-002), so the 750 C figure is not a conflict with them.
- Ward 250 By the Numbers (unlisted, unfinished post, dated 28 June 2026) (Valar Atomics, 2026-06-28) primary company “The system experienced temps above 750c and pressures over 6MPa.”
- Energy Department Fuel Line Pilot Program (U.S. Department of Energy, Office of Nuclear Energy, 2026-02-12) primary government
- Valar Atomics job board (public Greenhouse feed, 92 postings) (Valar Atomics (via Greenhouse), 2026-09-28) primary company “Graphite is a specialized, abrasive material central to our reactor components”
- Graphite Production Lead (Torrance, California) (Valar Atomics (via Greenhouse), 2026-09-21) primary company
DOE named Valar on 30 September 2025 in 'the second round of conditional selections' for its Fuel Line Pilot Program, 'to support TRISO fuel fabrication for the Ward250 reactor deployment'; the program uses DOE authorization for fuel lines. Valar's QA program covers a 'Valarin Fuel Fabrication Facility' at the lab, based on German HOBEG methods and designed to stay below DOE Hazard Category 3 ('<HC3'; orig-038); DOE-STD-1271 bars adding nuclear material above Hazard Category 3 levels to a facility until the readiness review and startup approval are complete; a fuel line kept below that level would not reach that gate, and no record read says what review applies instead. DOE's categorical exclusion says the Ward 250 facility 'comprises the Reactor Complex and Fuel Laboratory', and Valar's QA program calls the Ward250 Fuel Laboratory a TRISO fuel manufacturing facility, but the CX's analysis does not mention fuel fabrication. Valar job postings open on 29 September 2026 seek engineers in Orangeville to 'install, troubleshoot, and optimize pilot scale uranium processing equipment' on a TRISO line (a fluidized-bed chemical vapor deposition coater; one posting asks for experience with wet chemistry or high-temperature processing), building on 'completed HAZOPs and existing safety analyses', a Nuclear Operations Manager to oversee 'both the reactor plant and the pilot TRISO fuel fabrication facility', and a material control and accounting specialist for special nuclear material 'at Valar Atomics TRISO manufacturing facilities'. DOE's selection release says each company bears all costs of building, operating and decommissioning its fuel facility. By comparison, Oklo announced in November 2025 that DOE's Idaho office had approved an NSDA for its fuel fabrication facility, the first under the fuel-line program. No NSDA, safety analysis, DOE authorization or state license for Valar's fuel line was found as of 29 September 2026. The Carbon County plan also includes fuel manufacturing (csite-007). The quality program gives no uranium inventory, enrichment or threshold for its <HC3 claim, and the safety agreement never mentions the fuel facility (it categorizes only the reactor, as Hazard Category 2), so the claim cannot be checked from Valar's public papers.
- Energy Department Selects Four Companies for Advanced Nuclear Fuel Line Pilot Projects (U.S. Department of Energy, 2025-09-30) primary government “To support TRISO fuel fabrication for the Ward250 reactor deployment”
- Ward250 San Rafael Facility Quality Assurance Program Description, No. 100474, Rev 02 (status: Approved) (Valar Atomics, 2025-10) primary company “ensures <HC3 categorization through multiple layers of inherent safety”
- NEPA Determination DOE-ID-26-005: Valar Ward250 Research Reactor (categorical exclusion B5.26) (U.S. Department of Energy, Office of Nuclear Energy (Idaho), 2026-04-22) primary government “The Ward250 facility comprises the Reactor Complex and Fuel Laboratory”
- Valar Atomics job board (92 open postings, public Greenhouse feed), read 2026-09-29 (Valar Atomics, 2026-09-29) primary company “install, troubleshoot, and optimize pilot scale uranium processing equipment”
- DOE-STD-1271-2025, Authorization Pathway for Nuclear Facilities (August 2025; DOE standard, copy posted by the Nuclear Innovation Alliance) (U.S. Department of Energy, Office of Nuclear Energy, 2025-08) primary government
- Ward250 San Rafael Facility Quality Assurance Program Description, No. 100474, Rev 02 (status: Approved) (Valar Atomics, 2025-10) primary company “The Ward250 Fuel Laboratory represents a state-of-the-art TRISO fuel manufacturing facility”
- Oklo Announces U.S. Department of Energy Approval for Nuclear Safety Design Agreement of Aurora Fuel Fabrication Facility (Oklo Inc. (Business Wire), 2025-11-11) primary company “has approved the Nuclear Safety Design Agreement (NSDA) for the Aurora Fuel Fabrication Facility”
Valar's NSDA commits Ward 250 to DOE's occurrence reporting order (NE O 232.1), accident investigations (NE O 225.1), ES&H reporting, independent oversight, and DOE's employee concerns and differing professional opinion programs (which DOE-STD-1271 says allow no alternative). DOE's Occurrence Reporting and Processing System page says access to occurrence reports is restricted to approved DOE and DOE contractor personnel; that page describes the department-wide order (DOE O 232.2A), while the NSDA commits to the Office of Nuclear Energy's own order, and whether Ward 250's reports go into the same system is not stated in any record read. No public report of an incident, occurrence, violation, enforcement action or worker injury at Ward 250, NOVA or the fuel line was found in DOE, state or news sources read as of 29 September 2026. OSHA's site refused our reader (robots.txt 403), so its inspection database could not be searched. Absence of a public record is not evidence that nothing happened; DOE's occurrence reports for Ward 250 can be requested under FOIA. Valar's quality program (p.20) cites a different occurrence-reporting order, NE O 232.2; in DOE's own numbering 232.2 (2011) replaced 232.1 (1990s). The NE orders are not public, so which is current cannot be checked.
- Ward250 Nuclear Safety Design Agreement, No. 100403, Rev 02 (status: Draft; issued for Public Release) (Valar Atomics, 2025-10) primary company “Occurrence Reporting and Processing of Operations Information”
- Occurrence Reporting and Processing System (U.S. Department of Energy, Office of Environment, Health, Safety and Security) primary government “access to occurrence reports is restricted to approved DOE and DOE contractor personnel”
- DOE-STD-1271-2025, Authorization Pathway for Nuclear Facilities (August 2025; DOE standard, copy posted by the Nuclear Innovation Alliance) (U.S. Department of Energy, Office of Nuclear Energy, 2025-08) primary government
Valar's public job board (Greenhouse, read 29 September 2026; postings updated 28 September) lists 92 openings: 71 in Torrance, California and 21 in Orangeville, Utah, and none in Carbon County, Price or Wellington. The Orangeville posts include plant operators, nuclear operations engineer and manager, instrumentation and electrical technicians, a site environmental health and safety specialist, a construction quality inspector, a development and construction finance director, and a Material Control and Accounting Specialist, whose post says the job leads the safeguards program for special nuclear material at Valar's TRISO manufacturing facilities under DOE and NRC requirements. Two fuel posts (a TRISO chemical plant process engineer, posted 16 July, and a TRISO chemical vapor deposition engineer, posted 31 July 2026) describe work to 'install, troubleshoot, and optimize pilot scale uranium processing equipment' in Orangeville; the second calls it a manufacturing 'pilot line' and says the engineer will build on 'completed HAZOPs and existing safety analyses' (a HAZOP is a structured hazard review) as 'the process transitions into production'. Set beside the record: in June 2026 Valar told Orangeville the fuel building would make it the largest US maker of this fuel once completed (loc-016); the job posts describe a pilot stage now; no DOE authorization for the fuel line was found in the public record (safe-031); and the local job figures in loc-004 cannot be matched to a payroll. Job boards change daily; these counts are as of 29 September 2026.
- Valar Atomics job board (Greenhouse public board API: 92 postings with locations and descriptions) (Valar Atomics) primary company “optimize pilot scale uranium processing equipment”
- Material Control and Accounting Specialist (Orangeville, Utah), Valar Atomics job posting (Valar Atomics, 2026-07-22) primary company
- Chemical Vapor Deposition Engineer (TRISO) (Orangeville, Utah), Valar Atomics job posting (Valar Atomics, 2026-07-31) primary company
Valar's public job board (read 29 September 2026; 92 openings, 86 first posted since June 2026) adds detail to loc-019. Torrance-listed roles (71): instrumentation and controls (19), eight 'Power Conversion' turbomachinery roles for a planned 'secondary loop Brayton cycle' (a gas turbine driven by reactor heat) with 'a purpose-built test facility program', manufacturing, machine and weld shops, graphite production, supply chain, licensing and legal. Orangeville roles (21): site operations (a Nuclear Operations Manager, a Nuclear Operations Engineer and Plant Operators who may work at 'the reactor plant or the pilot fuel fabrication facility'), fuels and materials (TRISO process and coating engineers, a nuclear material accountant), controls, QA, EH&S, HR, and a Development and Construction Finance Director whose job is cost tracking 'across active projects' and processes that 'scale across multiple construction sites'. A Project Manager, Commercial Projects (Torrance, 'operate in both Hawthorne and Utah') will 'lead development execution for one of Valar's first commercial projects' from site development to investment decision, asks applicants for experience on projects costing '$1B or more' (the post does not give this project's own cost), and will serve as a senior project representative in Utah with government and community; the post names no site. A Director of Licensing will run 'multiple concurrent licensing campaigns' across DOE and NRC pathways (safe-032). No posting mentions Carbon County, Wellington, Green River or any named future site, and none is located in Carbon County. The Power Conversion post says Valar's HTGR 'power conversion system will be built around' this turbine cycle, in the future tense; Ward 250's July electricity demonstration used a thermoelectric generator, not a turbine (ETV, 1 July; plan-010).
- Valar Atomics job board (public Greenhouse feed, 92 postings) (Valar Atomics (via Greenhouse), 2026-09-28) primary company “secondary loop Brayton cycle”
- Project Manager, Commercial Projects (Torrance, California) (Valar Atomics (via Greenhouse), 2026-05-17) primary company “lead development execution for one of Valar’s first commercial projects”
- Development and Construction Finance Director (Orangeville, Utah) (Valar Atomics (via Greenhouse), 2026-07-14) primary company “scale across multiple construction sites”
- Director of Licensing (Torrance, California) (Valar Atomics (via Greenhouse), 2026-08-11) primary company “multiple concurrent licensing campaigns”
- Director Instrumentation, Control, and Electrical - Power Conversion (Torrance, California) (Valar Atomics (via Greenhouse), 2026-06-30) primary company “paired with development generator sets and a purpose-built test facility program”
- Emery County takes center stage as Valar and Nvidia power historic breakthrough (ETV News (Kevin Butler), 2026-07-01) news “converted into electricity through a thermoelectric generator”
The Trust Lands staff memo for the 17 September 2026 board meeting, in its 'Applicant' background section, states that Ward 250 'reached full power operations on June 21, 2026' and generated electricity on 1 July. The memo does not say who supplied the date; the next paragraph says 'The applicant represents' what its DOE approvals show. ANS reported on 22 June 2026 that Valar 'is now proceeding with a planned power ascension' and announced that day an output of 10 kWt, a tenth of the reactor's 100 kWt rating. If the reactor was at full power on 21 June, a 22 June announcement of 10 kWt with power ascension still under way does not fit: either the 21 June date is wrong or the 22 June announcement described an earlier step, and no public record says which. On 24 June Valar's Harry Hansen told Price's council the reactor had gone to full power 'shortly after' going critical (plan-006). The memo also says Valar holds a DOE 'Certificate of Readiness' and has 'brought and sustained that reactor through an initial testing campaign'; no such certificate has been published (safe-007, gov-037). The board had these statements in its packet when it approved the lease on 17 September (mine-011, mine-016).
- Board of Trustees Meeting Materials, September 17, 2026 (SULA 2095-OBA staff memo, pages 18-19) (Utah Trust Lands Administration, via Utah Public Notice Website, 2026-09-17) primary government “The reactor reached full power operations on June 21, 2026”
- Valar's Ward 250 reaches criticality in Utah (American Nuclear Society, Nuclear Newswire, 2026-06-22) news “Valar is now proceeding with a planned power ascension”
- Price City Council celebrates Valar Atomics reaching full power ahead of schedule (ETV News (Stephanie Olsen), 2026-06-25) news “Shortly after that, we took it to full power”
Valar's Castle Country page says Ward 250 flew to Utah on three C-17s 'in partnership with the Department of Energy and the Department of War' (Operation Windlord, 15 February 2026; orig-030, orig-027). No Defense Department contract with Valar is on the federal spending record (gov-027), and who paid for the flights is reported, not documented (fund-013). The Defense Innovation Unit's list of companies eligible for its Advanced Nuclear Power for Installations program (10 April 2025) names eight firms (Antares, BWXT, General Atomics, Kairos, Oklo, Radiant, Westinghouse, X-energy), not Valar. The Army's Janus program (26 August 2026) picked five vendors for five bases, up to $2.2 billion combined (Antares, BWXT, General Atomics, Radiant, Westinghouse), not Valar. Valar's job board lists military technical experience as a qualification or preference in several posts, and one post asks for the ability to obtain any required DOE or NRC access or clearance (plan-011), but no military customer, contract or site for a Valar reactor was found as of 29 September 2026.
- Army reaches agreement with private industry for nuclear micro-reactors (U.S. Army, 2026-08-26) primary government “the Janus Program has selected five nuclear energy vendors, and five initial locations”
- DOD selects eligible companies for the Advanced Nuclear Power for Installations Program (Defense Innovation Unit, 2025-04-10) primary government “Selected companies for the ANPI program include:”
- Castle Country (Valar Atomics, 2026-09) primary company “in partnership with the Department of Energy and the Department of War”
DOE's environmental determination for Ward 250 (signed 22 April 2026) describes the Ward250 facility as a 'Reactor Complex and Fuel Laboratory' inside a security fence of about 2 acres, within the state-run Utah San Rafael Energy Research Center, a 20.6-acre site near Orangeville; the reactor complex is about 55 feet high and made of modular buildings on engineered foundations tied only to existing lab utilities. A joint update from the state lab and Valar, run in ETV News on 23 January 2026, said local contractors had moved and crushed about 40,000 cubic yards of material and poured over 4,000 cubic yards of concrete for foundations of the Ward 250 test reactor and a fuel fabrication facility. ETV (24 August 2026), reporting a business-chamber tour on 19 August, said the reactor was now enclosed in cement bricks that hide it from view, and described an operations center and exhaust equipment designed to detect radioactive particles and shut the exhaust off. Valar's open job posts (29 September 2026) staff both 'the reactor plant' and a 'pilot TRISO fuel fabrication facility' in Orangeville. Other things at or beside the lab are recorded elsewhere: Valar's proposed 10 MW gas-fired test heater, approved only for design (gov-014); other nuclear companies courting the lab (gov-031); the 112-acre county parcel next door that Valar is buying (gov-022, loc-014); and the unauthorized sewer tie-in (loc-015).
- NEPA Determination DOE-ID-26-005: Valar Ward250 Research Reactor (U.S. Department of Energy, Office of Nuclear Energy, 2026-04-22) primary government “comprises the Reactor Complex and Fuel Laboratory enclosed within a security-fenced area”
- Rapid construction from local contractors at Valar Atomics (USREL press release, Energy Corner) (Utah San Rafael Energy Lab and Valar Atomics, via ETV News, 2026-01-23) primary government “The site will house Valar’s fuel fabrication facility and the WARD 250 test reactor.”
- Emery County Business Chamber gets an up-close look at Valar Atomics progress (ETV News (Stephanie Olsen), 2026-08-24) news
- Valar Atomics job board (public Greenhouse feed, 92 postings) (Valar Atomics (via Greenhouse), 2026-09-28) primary company “Operators may be assigned to either the reactor plant or the pilot fuel fabrication facility”
The minutes of the Trust Lands board's 20 August 2026 meeting (in the 17 September packet, on that day's agenda for approval) record that, answering an online question about jobs after construction, Valar's Max Ukropina and Jess Housekeeper said full development plans were still being finalized and that the current facility 'employs roughly 40 full-time local residents' and uses 50 to several hundred local contractors within a 20-30 mile radius, supported by six recruiters. Beside the other figures on record: on 1 July 2026 ETV reported Valar officials saying the company had hired about 50 local employees, not counting contractors; per loc-004, in April 2026 Valar told Ferron it employed 120 people in Emery County, many not living in Utah; in August it told Orangeville it had recently hired 40 people from the area; it projects 275 jobs for its state tax credit (fund-017); its job board lists 21 open Orangeville positions and 71 in California (plan-011). The figures mostly count different groups; the August figure is limited to full-time local residents, while the July figure's definition was not given; no payroll or headcount filing was found to check them.
- Board of Trustees Meeting Materials, September 17, 2026 (minutes of August 20, 2026 for approval, pages 10-11) (Utah Trust Lands Administration, via Utah Public Notice Website, 2026-09-17) primary government “their current facility employs roughly 40 full-time local residents”
- Emery County takes center stage as Valar and Nvidia power historic breakthrough (ETV News (Kevin Butler), 2026-07-01) news “hired approximately 50 local employees, not including contractors”
Claims: the technology page says Valar designed and built its test reactor 'in record time'; the Series B post says it took seven months to take Ward 250 critical; Taylor told DOE the site was empty nine months before criticality (orig-010); the June 2026 draft counts 'only 9 months' from groundbreaking to power. Record: Valar's own safety and QA papers say Ward 250 incorporates Ward Zero hardware (orig-059), and Ward Zero took about ten months to design and build, by Taylor's account to TechCrunch, before its February 2025 completion (orig-005), seven months before the Utah groundbreaking. The core physics was tested in Nevada in November 2025 on a Los Alamos machine (orig-008), and the Series B post itself says the NOVA core took two years. The short timelines hold as worded for the Utah site and for the step from the Nevada core test to Utah criticality (seven months, November 2025 to June 2026; orig-015), but the reactor was the product of roughly two years of earlier work in California and Nevada.
- Technology | Valar Atomics (Valar Atomics) primary company “We designed and built our advanced test reactor in record time.”
- Announcing our $1B Series B Led By Sequoia (Isaiah Taylor) (Valar Atomics, 2026-08-04) primary company “It took seven months to take Ward 250 critical.”
- Valar Atomics comes out of stealth with $19M and a pilot reactor site (Mike Butcher) (TechCrunch, 2025-02-20) news “constructed our thermal test unit in a period of about 10 months”
- Ward 250 By the Numbers (unlisted draft page) (Valar Atomics, 2026-06-28) primary company “we broke ground on this test site in September of last year”
At the 1 July 2026 event at the Orangeville site (orig-042), ETV reported that Valar's Max Ukropina and NVIDIA representatives 'discussed a collaboration to explore' nuclear-powered AI factories, including a proposed 30-megawatt facility in Emery County, and that the reactor was raised to 37% power to supply electricity to a server hosting a website. KSL/Deseret (6 July) wrote that the companies are 'exploring the deployment' of a 30 MW data center fully powered by their reactor. Valar's Series B post (4 August) calls it 'a collaboration on a waterless 30 MW AI factory'. No contract, memorandum or NVIDIA release was found: a search of nvidia.com returned nothing on Valar, and no filing names a Valar-NVIDIA agreement. In July Valar told the state economic board of 'a waterless data center in Orangeville' (gov-033); in June its public-affairs representative told Orangeville the reactor's energy has no set purchaser (loc-016). Scale: 30 MW is 300 times Ward 250's 100 kW heat rating, and more than that in electricity, since only part of the heat becomes electricity. No reactor Valar has built or had authorized could supply it; it would take a fleet or much larger reactors, which for sold power would need NRC licensing (csite-010, safe-030). If ETV's 37% is of the 100 kW rating, the demonstration ran at roughly 37 kW of heat, and ETV says the electricity came from a thermoelectric generator, which turns only part of the heat into electricity; KSL/Deseret's line that the reactor 'is now generating 100 kilowatts of electricity' (orig-042) fits neither figure.
- Emery County takes center stage as Valar and Nvidia power historic breakthrough (ETV News (Kevin Butler), 2026-07-01) news “discussed a collaboration to explore nuclear-powered AI factories”
- New partnership touts nuclear-powered AI with minimal water use (KSL.com (Eva Terry, Deseret News), 2026-07-06) news “exploring the deployment of a 30 megawatt data center”
- Announcing our $1B Series B Led By Sequoia (Valar Atomics, 2026-08-04) primary company “a collaboration on a waterless 30 MW AI factory”
No power purchase agreement, utility contract or named customer for Valar was found as of 29 September 2026. What the record shows instead: in June 2026 Valar's public-affairs representative told Orangeville the reactor's energy has no set destination or purchaser (loc-016); in July Valar told the state economic board its fastest path is selling to 'behind-the-meter customers willing to pay a premium', skipping grid interconnection (gov-033); in August it told a local business chamber it might build reactors for heavy industrial users, naming a local manufacturer 'strictly as an example' (ETV, 24 August); NVIDIA's role is an announced study (plan-010); and on 17 September, just before the Carbon lease vote, Valar's Harry Hansen told the Trust Lands board that Valar was at the point where site control 'becomes the next conversation when it comes to off-takers', after which it could talk about bringing in buyers for the power (auto-generated meeting transcript). Abroad, Bilyonaryo reported on 2 July 2026 that Meralco, the Philippines' largest electricity distributor, would hold talks with Valar 'in the coming days', according to its chief operating officer, who added that Meralco is open to other small-reactor technologies and that any investment must rest on proven designs. No agreement from those talks was found. No U.S. utility (Rocky Mountain Power/PacifiCorp or others) was found naming Valar in a search of the web; the Utah Public Service Commission's docket site answered with a bot check and could not be searched. Selling Ward 250's power is outside DOE's research-only basis for authorizing it (safe-030).
- MVP opens talks with US firm Valar Atomics on next-gen nuclear reactor (Bilyonaryo (staff), 2026-07-02) news “will hold talks with Valar representatives in the coming days”
- Emery County Business Chamber gets an up-close look at Valar Atomics progress (ETV News (Stephanie Olsen), 2026-08-24) news “strictly as an example”
- Orangeville City Council Regular Meeting Minutes, June 11, 2026 (Orangeville City, via Utah Public Notice Website, 2026-06-11) primary government “the energy does not currently have a set destination or purchaser”
- 09.17.2026 TLA Board of Trustees Meeting Audio (auto-generated transcript) (Utah Trust Lands Administration, via Utah Public Notice Website, 2026-09-17) primary government “Valor's at the point where site control becomes the next conversation”
ETV News (3 July 2026) reported the Carbon County Commission meeting of Wednesday 1 July 2026 (ETV's text gives 'June 2' and 'June 1', but its publication date, the fire restrictions ahead of the Fourth of July and the NVIDIA announcement place it on 1 July; the commission's 1 July minutes record the same celebration, csite-026). As ETV reported it, Commissioner Jared Haddock described Ward 250 as having recently become 'the first government-approved commercial reactor' to achieve a self-sustaining reaction outside a federal lab, and Commissioner Tony Martines said that because Valar's reactor is gas-cooled and NVIDIA's chips are air-cooled, the planned data center won't need water. Set beside the record: Valar's own February 2026 release says Ward 250 is a research reactor and 'not a commercial power plant' (loc-003); DOE's pilot is for research and 'not' to demonstrate commercial suitability (gov-007); DOE's 'first DOE authorized reactor built outside of a national laboratory' holds (orig-010). On water, Valar's own account to Emery County was that the data center would use a closed-loop cooling system 'designed for low water consumption' and that it already had the water it needs, while seeking up to 1,000 more shares for other projects (ETV, 28 July; mine-042). The 'first outside a federal lab' part holds; 'commercial' and 'won't need water' go beyond what Valar and DOE say.
- Carbon County Commissioners urge safety ahead of July 4th, reflect on freedom and democracy (Stephanie Olsen) (ETV News, 2026-07-03) news “the first government-approved commercial reactor”
- Valar Atomics welcomes community for reactor facility open house (Valar Atomics press release) (ETV News, 2026-02-24) primary company “it is not a commercial power plant”
- Emery County Commissioners Debate Solar, Data Centers and EMS Funding (Kevin Butler) (ETV News, 2026-07-28) news
Valar's unlisted 'Ward 250 By the Numbers' draft (28 June 2026) embeds a chart titled 'Reactor Power Ascension - TE3401 thermocouples with Q_Total, Power, and Control Bank overlays'. The horizontal axis is 'Sample index' (0 to about 245), not time; no date or clock time appears. A black line 'Q_Total' on an unlabeled right-hand scale of 0 to 100 rises in steps (about 15, about 52, then about 95 to 100) and then drops to near zero around sample 230, when the 'Control Bank Steps' line also falls to zero, which looks like a shutdown. The ten thermocouple lines (TE3401-094 to -105 in the legend) read between about 30 and 80 degrees Fahrenheit, so they are not core temperatures. The title promises a 'Power' overlay that the legend does not show. If Q_Total is in kilowatts, the chart is consistent with a climb to about 100 kW followed by shutdown; the chart itself does not say so, and it cannot show when this happened, for how long, or whether it matches DOE's authorization. No DOE or independent power record has been published to compare it with (plan-006, safe-007).
- Reactor Power Ascension - TE3401 thermocouples with Q_Total, Power, and Control Bank overlays (chart image) (Valar Atomics, 2026-06-28) primary company
- Ward 250 By the Numbers (unlisted draft, dated 28 June 2026) (Valar Atomics, 2026-06-28) primary company
The NSDA's safety limits (page 25) set 'Maximum continuous power: 100 kWth' and 'Maximum short duration power (1hr): 250 kWth'; its design table (page 52) says '≤250 kWth (Limited tests)'. Valar's unlisted 'Ward 250 By the Numbers' page (28 June 2026, still containing placeholders such as 'July XX') says the reactor is 'licensed' for 30 effective full-power days at 100 kWt 'and up to one day at 250kWt'. If the page's day means one continuous day, it would be 24 times the NSDA's per-run limit; if it is a total across runs, the two can fit. Neither document says which. The final DSA and TSRs, which set the authorized limit, are not public, so which figure DOE approved is unknown. DOE's categorical exclusion and Valar's NSDA web summary describe Ward 250 simply as a 250 kWth reactor; ANS (June 2026) reports that Taylor 'has indicated the Ward 250 is a 100-kWt reactor', and POWER describes it as rated at 100 kWt initial test power (orig-011, orig-031). Ward 250 has no NRC license; 'licensed' is the company's word for a DOE authorization.
- Ward250 Nuclear Safety Design Agreement, No. 100403, Rev 02 (status: Draft; issued for Public Release) (Valar Atomics, 2025-10) primary company “Maximum short duration power (1hr): 250 kWth”
- Ward 250 By the Numbers (unlisted company page with placeholders, signed Isaiah Taylor) (Valar Atomics (Isaiah Taylor), 2026-06-28) primary company “up to one day at 250kWt”
- NEPA Determination DOE-ID-26-005: Valar Ward250 Research Reactor (categorical exclusion B5.26) (U.S. Department of Energy, Office of Nuclear Energy (Idaho), 2026-04-22) primary government “Ward250 is a 250 kilowatt thermal (kWth) high temperature gas-cooled reactor”
- Valar's Ward 250 reaches criticality in Utah (American Nuclear Society, Nuclear Newswire, 2026-06-22) news “has indicated the Ward 250 is a 100-kWt reactor”
- Valar Atomic's Ward 250 Becomes Second Reactor to Go Critical Under DOE Pilot Program (POWER magazine (Sonal C. Patel), 2026-06-19) news “rated at 100 kWt initial test power and scalable to 5 MWe”
Valar's NSDA sets target performance for decay-heat removal: capacity for 100% of decay heat, natural circulation within 30 minutes, and 'No operator action required for 72 hours' (page 23); it credits a reactor cavity cooling system, a vessel auxiliary cooling path and conduction to the structures. DOE's categorical exclusion (April 2026), describing the project's attributes, states that the passive system keeps fuel below safety limits 'indefinitely' without operator action or outside power. Valar's Castle Country page says that on 26 June 2026 it shut Ward 250 down, switched off every active cooling system, simulated a total loss of electrical power and watched the reactor cool itself. That test came eight days after the first criticality DOE announced (18 June). ANS reported Valar's announcement that it reached 10 kWt on 22 June, and Valar's Castle Country page says full power came 'days later' than criticality; no DOE or independent record of the test, and no power log before it, was found; how much heat a reactor must shed after shutdown depends on how long and how hard it ran, which the NSDA's own accident method ties to operating history (safe-009). The claim of passive cooling is consistent with the design documents; the June 26 demonstration rests on the company's account.
- Ward250 Nuclear Safety Design Agreement, No. 100403, Rev 02 (status: Draft; issued for Public Release) (Valar Atomics, 2025-10) primary company “No operator action required for 72 hours”
- NEPA Determination DOE-ID-26-005: Valar Ward250 Research Reactor (categorical exclusion B5.26) (U.S. Department of Energy, Office of Nuclear Energy (Idaho), 2026-04-22) primary government “maintains fuel temperatures below safety limits indefinitely without operator action or external power”
- Castle Country | Valar Atomics (Valar Atomics) primary company “Then we watched the reactor cool itself safely, exactly as designed.”
- Valar's Ward 250 reaches criticality in Utah (American Nuclear Society, Nuclear Newswire, 2026-06-22) news “on June 22 announced it had reached a 10 kWt output”
DOE's release of 18 June 2026 opens 'Today' and says Ward 250 'successfully completed' a zero-power fueled criticality demonstration; it gives no clock time, and 'today' may describe the announcement rather than the first moment of criticality. DOE's 25 July fact sheet says that on 18 June DOE 'announced' it, and DOE's program page lists 18 June as the date the press release was published. Valar's own dated statements agree on 18 June: its Series B post (4 August) says 'On June 18, Ward 250 achieved self-sustaining criticality', and its Castle Country page lists the milestone under '18 June 2026'; KSL/Deseret (6 July) also reported it went critical on 18 June. On 24 June Valar's Harry Hansen told Price's council 'We went critical last week' (ETV). The one apparent outlier is Valar's unlisted, unfinished 'Ward 250 By the Numbers' post, dated 28 June 2026 under Isaiah Taylor's name, which says it has been '14 days since we first went critical' and 'two weeks'; the same post still carries placeholders ('made power on July XX', '[xxx]'), so it reads as drafted about 2 July under an earlier 28 June date field, and its 14 days fits DOE's 18 June date (disc-040). The Series B post also has two loose counts of its own: electricity came 'just a week later' than 18 June, while the public demonstration was on 1 July; and it 'took seven months' to take Ward 250 critical, while Taylor said on 18 June the site had been empty nine months earlier (the counts may start from different points). No DOE record read states the date and time of first criticality; the startup approval and operating logs are not public (safe-007).
- Department of Energy Celebrates Second Advanced Reactor Achieving Criticality (U.S. Department of Energy, 2026-06-18) primary government “successfully completed a zero-power fueled criticality demonstration”
- Announcing our $1B Series B Led By Sequoia (Valar Atomics, 2026-08-04) primary company “On June 18, Ward 250 achieved self-sustaining criticality”
- Castle Country (Valar Atomics, 2026-09) primary company
- New partnership touts nuclear-powered AI with minimal water use (KSL.com (Eva Terry, Deseret News), 2026-07-06) news “went critical on June 18”
- Price City Council celebrates Valar Atomics reaching full power ahead of schedule (ETV News (Stephanie Olsen), 2026-06-25) news “We went critical last week with our reactor”
- FACT SHEET: The Golden Era of American Nuclear Energy Has Arrived (U.S. Department of Energy, 2026-07-25) primary government “On June 18, 2026, the Energy Department announced Valar Atomics' advanced test reactor”
- Ward 250 By the Numbers (unlisted draft, dated 28 June 2026) (Valar Atomics, 2026-06-28) primary company “it’s been 14 days since we first went critical”
- U.S. Department of Energy Reactor Pilot Program (U.S. Department of Energy, Office of Nuclear Energy, 2026-07) primary government “announcing criticality for Valar Atomics, published June 18, 2026”
A Los Alamos article on the NOVA experiment (LA-UR-26-20601), in the Spring 2026 newsletter of DOE's Nuclear Criticality Safety Program, says NOVA ran at NCERC over four weeks in November and December 2025 on the Deimos capability, with the inner core changed to 'a portion of the Ward250 reactor'. It says NOVA used many of Ward250's actual materials, including the type of graphite, control-rod material and fixed-absorber material. It says data were taken in 36 configurations, 10 of them critical, and that the fuel was the HALEU TRISO 'CNPS compacts previously used in Deimos'. LANL's December 2024 Deimos release says that experiment used components long in the NCERC inventory, 'such as the fuel'. LANL's Deimos paper says the CNPS fuel came from a 1980s Los Alamos experiment (dir-027). The joint LANL-Valar NOVA release on Valar's site (18 November 2025) says under 'Roles and Safeguards' that Valar Atomics provided the reactor core, TRISO fuel and system configuration, and ANS Nuclear News reported the same on 18 November 2025 (orig-008, orig-032, plan-014). The two accounts differ on where NOVA's fuel came from. No record read explains the difference. (Updates orig-008.)
- NCSP Newsletter, Spring 2026: 'Nuclear Observations for Valar Atomics (NOVA)', LA-UR-26-20601 (pp. 5-6) (U.S. DOE Nuclear Criticality Safety Program (Los Alamos article; hosted by LLNL), 2026-05-22) primary government “(HALEU) Tri IsoStructural (TRISO) CNPS compacts previously used in Deimos”
- Los Alamos conducts first critical experiment using high assay low enriched uranium in decades (Los Alamos National Laboratory, 2024-12-16) primary government “existing components that have long been in the NCERC inventory, such as the fuel”
- Los Alamos National Laboratory and Valar Atomics Announce Project NOVA Criticality Milestone in Nevada (Valar Atomics / Los Alamos National Laboratory (joint release on Valar's site), 2025-11-18) primary company “provided the reactor core, TRISO fuel, and system configuration.”
- Valar achieves cold criticality at LANL (American Nuclear Society, Nuclear News, 2025-11-18) news “Valar provided the reactor core, system configuration, and the TRISO fuel itself.”
The certificate half of DOE's May 2026 shipping review is a one-page memorandum dated 20 May 2026 from DOE's Headquarters Certifying Official (Director, Office of Packaging and Transportation) to the Manager of DOE's Savannah River Operations Office. Answering email requests of 30 April and 19 May 2026 made for the Savannah River Site Office Manager, it amends Certificate of Compliance 9979, Revision 20, to authorize 'limited shipments' of TRISO fuel compacts from the National Criticality Experiments Research Center in Nevada to the Valar Atomics Ward 250 reactor site in Utah. Its conditions are: 170 compacts per package, secured in the WARD250 fuel block (drawing V-002782); at most 234.94 g of U-235 per block; 'The maximum U-235 enrichment is less than 20 weight percent'; a criticality safety index of 1.0; and expiry on 30 June 2027 or at completion of shipments. The companion SER (safe-010) says the uranium is 'enriched to a maximum of 19.9 wt.% U-235'. Both are limits on what may be shipped, not a measurement of what was loaded. No earlier authorization for these contents in this package was found. Revision 21 of the same certificate (date of issuance 2 September 2026; answering a 1 December 2025 request supplemented 13 April 2026) and its SER do not mention Valar, Ward 250 or the letter amendment, and neither says whether the Valar authorization carries forward. (Updates safe-010.)
- Letter Amendment of Department of Energy Certificate of Compliance Number 9979 (memorandum, Revision 20 LA1) (U.S. Department of Energy, Office of Packaging and Transportation, 2026-05-20) primary government “The maximum U-235 enrichment is less than 20 weight percent.”
- Safety Evaluation Report, Letter Amendment of Certificate of Compliance No. 9979, Docket 26-35-9979 (U.S. Department of Energy, Packaging Certification Program, 2026-05-20) primary government “enriched to a maximum of 19.9 wt.% U-235”
- Amendment of DOE Certificate of Compliance Number 9979, Revision 21 (memorandum and certificate) (U.S. Department of Energy, Office of Packaging and Transportation, 2026-09-02) primary government “Revision 21, for the Model 9979 package is issued for amendment”
- Safety Evaluation Report for Amendment of DOE CoC 9979, Docket 26-04-9979 (U.S. Department of Energy, Packaging Certification Program, 2026-09) primary government
The only fuel supply for Valar on the record is DOE's: a Safety Evaluation Report approved 20 May 2026 lets Savannah River's shipping package carry 'limited shipments' of HALEU TRISO fuel compacts from the National Criticality Experiments Research Center in Nevada to the Ward 250 site, at most 24 packages, one Valar-designed graphite fuel block each, expiring 30 June 2027 or when shipments end (safe-010, safe-011, safe-012). The report describes each block as 170 TRISO compacts holding 234.94 grams of uranium-235 at under 20% enrichment. Valar's own safety agreement (NSDA, October 2025, Table 6) lists the fuel enrichment as '4.95% U-235' on the basis of 'LEU limits'; the two documents describe different fuel, and no document read explains the difference (disc-001). No public record read gives the dates the fuel actually moved (plan-025). Neither that report nor Valar's NOVA release nor World Nuclear News's NOVA report (21 November 2025) names who fabricated the TRISO particles or compacts, or who owns the high-assay uranium; Valar is not in DOE's three announced HALEU allocation rounds (gov-008). Valar's Series B post says it 'will not rely on outside suppliers' and will make fuel in labs beside its reactors (orig-070), and its Carbon plan has uranium shipped in as HALEU, LEU+ or LEU (csite-007). But making TRISO still needs enriched uranium from an enrichment plant; Valar has no enrichment capacity, and a web search in the earlier pass found no supply contract with any U.S. enricher (Centrus, Urenco, Orano, General Matter). For comparison, World Nuclear News reported on 18 September 2026 that the fuel for Antares's criticality test, another DOE pilot reactor, was supplied by BWX Technologies, and that Antares had signed a multi-year HALEU supply contract with Centrus (the article gives no signing date). Valar is one of 84 signers of DOE's Defense Production Act fuel-cycle pact (gov-001), which is a framework, not a supply contract.
- Safety Evaluation Report, Letter Amendment of Certificate of Compliance No. 9979, Revision 20 (Valar Atomics fuel elements) (U.S. Department of Energy, Packaging Certification Program, 2026-05-20) primary government “from the National Criticality Experiments Research Center in Nevada to the Valar Atomics”
- Valar Atomics project achieves early criticality milestone (World Nuclear News, 2025-11-21) news “NOVA uses the same fuel, moderator and reactivity-control scheme as Ward250”
- Announcing our $1B Series B Led By Sequoia (Valar Atomics, 2026-08-04) primary company “Valar will not rely on outside suppliers for the fuel needed to deploy and operate.”
- Antares, Centrus sign multi-year HALEU contract (World Nuclear News, 2026-09-18) news “The fuel for the criticality demonstration was provided by BWX Technologies, Inc.”
- Ward250 Nuclear Safety Design Agreement, No. 100403, Rev 02 (October 2025), Appendix A, Table 6: Key design parameters (Valar Atomics, 2025-10) primary company “4.95% U-235”
A DOE Safety Evaluation Report, prepared by the manager of DOE's Packaging Certification Program and approved by DOE's Headquarters Certifying Official on 20 May 2026, reviews and recommends an amendment to the certificate of the Model 9979 shipping package to allow 'limited shipments' of high-assay low-enriched uranium (HALEU) TRISO fuel compacts from the National Criticality Experiments Research Center (NCERC) in Nevada to the Valar Ward 250 reactor site in Utah. Each package holds one hexagonal graphite 'WARD250 FUEL BLOCK' (Valar drawing V-002782) with 170 compacts; the U-235 in a block is 234.94 grams 'at less than 20% enrichment', the application describes the uranium in the particles as 'enriched to a maximum of 19.9 wt.% U-235', and the stated condition is 'less than 20 weight percent'. The report says the block's end use is as a fuel element in the Ward 250 microreactor. Valar's NSDA (October 2025, Table 6) lists Ward 250's fuel enrichment as '4.95% U-235' on the basis of 'LEU limits', and says that if the fuel differs from the specification its safety assumptions will be updated in the PDSA. The later PDSA and DSA are not public, so whether DOE's approved safety basis was updated to HALEU cannot be checked. This is the DOE record that disc-001 lacked: it matches the NOVA release's 'HALEU TRISO' wording (orig-008, orig-009) and a Valar speaker's statement that part of the core went critical in Nevada (mine-033), and conflicts with the NSDA's 4.95% figure (orig-034, orig-040). Per element, the NSDA's own figures imply 162.83 g of U-235 in 3.29 kg of heavy metal; DOE's block holds 234.94 g of U-235 in 1.18 kg of uranium. No single enrichment fits both (76 such blocks holding 250 kg would need 7.14%), so Table 6's equal per-element loading does not match the block DOE cleared, unless some of the 76 elements are unfueled or loaded differently, which the paper does not say.
- Safety Evaluation Report, Letter Amendment of Certificate of Compliance No. 9979 for the Model 9979 Package, Docket 26-35-9979 (U.S. Department of Energy, Office of Packaging and Transportation (Packaging Certification Program), 2026-05-20) primary government “limited shipments of high-assay low-enriched uranium (HALEU) tri-structural isotropic (TRISO) fuel”
- Safety Evaluation Report, Letter Amendment of Certificate of Compliance No. 9979 for the Model 9979 Package, Docket 26-35-9979 (U.S. Department of Energy, Office of Packaging and Transportation (Packaging Certification Program), 2026-05-20) primary government “The U-235 mass in the block is 234.94 grams at less than 20% enrichment.”
- Ward250 Nuclear Safety Design Agreement, No. 100403, Rev 02 (status: Draft; issued for Public Release) (Valar Atomics, 2025-10) primary company “4.95% U-235”
- Los Alamos National Laboratory and Valar Atomics Announce Project NOVA Criticality Milestone in Nevada (joint release on Valar's site) (Valar Atomics / Los Alamos National Laboratory, 2025-11-18) primary company “NOVA uses the same fuel, moderator, and reactivity-control scheme as Ward250”
- Safety Evaluation Report, Letter Amendment of Certificate of Compliance No. 9979 (U.S. Department of Energy, Office of Packaging and Transportation (Packaging Certification Program), 2026-05-20) primary government “enriched to a maximum of 19.9 wt.% U-235”
The DOE Safety Evaluation Report (safe-010) notes that 'only 24 packages (24 fuel elements)' would be authorized under the amendment, one fuel block per package, each limited to 234.94 grams of U-235: at most about 5.64 kg of U-235 in all (24 x 234.94 g). At an enrichment under 20%, each block carries at least about 1.17 kg of uranium (234.94 g divided by 0.20), so 24 blocks hold roughly 28 kg of uranium or more. Valar's NSDA describes a core of 76 fuel elements with about 250 kg of heavy metal at 4.95%, which is about 12.4 kg of U-235 (250 kg x 4.95%). The authorization expires on 30 June 2027 or when shipments are complete. At the state Trust Lands hearing on 17 September 2026, a Valar speaker described Ward 250 as 'very lightly loaded' and not a fully loaded core (mine-033). Whether other fuel reached Ward 250 by another route is not stated in any record read. Per element, the NSDA's own figures imply 162.83 g of U-235 in 3.29 kg of heavy metal; DOE's block holds 234.94 g of U-235 in 1.18 kg of uranium. No single enrichment fits both (76 such blocks holding 250 kg would need 7.14%), so Table 6's equal per-element loading does not match the block DOE cleared, unless some of the 76 elements are unfueled or loaded differently, which the paper does not say.
- Safety Evaluation Report, Letter Amendment of Certificate of Compliance No. 9979 for the Model 9979 Package, Docket 26-35-9979 (U.S. Department of Energy, Office of Packaging and Transportation (Packaging Certification Program), 2026-05-20) primary government “only 24 packages (24 fuel elements) would be authorized for shipment”
- Ward250 Nuclear Safety Design Agreement, No. 100403, Rev 02 (status: Draft; issued for Public Release) (Valar Atomics, 2025-10) primary company
World Nuclear News reports that Ward 250 was flown on 15 February 2026 'without its nuclear fuel', and, citing Reuters, that Energy Secretary Wright said the fuel would move separately from the Nevada National Security Site. DOE's packaging review (safe-010) followed: DOE's Savannah River Operations Office asked on 30 April 2026 to use the Model 9979 package (a 30-gallon drum inside a 55-gallon drum, a Type A fissile package) for the Ward 250 fuel blocks; the application, prepared by Savannah River National Laboratory, was revised on 18 May 'to correct decay heat and A2 mixture errors noted by DOE PCP staff'. DOE staff ran their own criticality calculations, which agreed with the applicant's, and the report, approved on 20 May, sets conditions (unsealed bagging, criticality safety index 1.0, at most 234.94 g of U-235 per package, expiry 30 June 2027 or when shipments end). Separately, DOE approved Valar's own radioactive-material packaging and transportation quality program (QA Program Approval 0049, issued 13 May 2026, corrected 18 May for Valar's address; expires 31 May 2031), covering Type B and fissile packagings. Neither DOE document states the shipping dates, route or mode, and no state or county notice of the shipments was found. Fresh (unused) TRISO fuel is only mildly radioactive: The application estimated the block's decay heat at about 0.0005 watts, which DOE's review accepted, and the review says shielding review is unnecessary for Type A fissile packages like this one.
- US microreactor transported by air (World Nuclear News, 2026-02-18) news “Fuel for the reactor will be transported separately from the Nevada National Security site”
- Safety Evaluation Report, Letter Amendment of Certificate of Compliance No. 9979 for the Model 9979 Package, Docket 26-35-9979 (U.S. Department of Energy, Office of Packaging and Transportation (Packaging Certification Program), 2026-05-20) primary government “to correct decay heat and A2 mixture errors noted by DOE PCP staff”
- Issuance of Quality Assurance Program Approval 0049 (Rev 1) for Valar Atomics, memorandum to Robert Boston, Manager, Idaho Operations Office (U.S. Department of Energy, Office of Packaging and Transportation (Packaging Certification Program), 2026-05-18) primary government
Minutes of the Utah Energy Research Board's 13 May 2026 meeting (PDF posted 14 August 2026) record Jess Housekeeper, Valar's Director of Utah Operations, saying in public comment that the final DOE readiness report was expected that Friday 'to prepare for receiving fuel and starting the reactor'. That reads as fuel not yet received (gov-037). DOE's letter amendment allowing fuel-compact shipments from Nevada to the Ward 250 site is dated 20 May 2026 (dir-025). DOE announced on 18 June 2026 that Ward 250 had completed a zero-power fueled criticality demonstration. So, on the record, fuel was on site by 18 June. It arrived after 13 May by Valar's account, and after 20 May if it came in the DOE-cleared package, the only route on record. DOE's categorical exclusion for Ward 250 (signed 22 April 2026) says 'Spent fuel is a single core loading' and 'No refueling occurs during the operational mission'. No record read gives the shipment date, route or mode, the date fuel was loaded, or how many of the 24 cleared blocks moved (plan-025, safe-011). (Updates plan-025.)
- Utah Energy Research Board, Meeting Minutes, May 13, 2026 (Utah Office of Energy Development (Utah Public Notice Website), 2026-08-14) primary government “to prepare for receiving fuel and starting the reactor”
- Letter Amendment of DOE Certificate of Compliance Number 9979 (memorandum) (U.S. Department of Energy, Office of Packaging and Transportation, 2026-05-20) primary government “Revision 20 is amended to authorize use of the Model 9979 for limited shipments”
- Department of Energy Celebrates Second Advanced Reactor Achieving Criticality (U.S. Department of Energy, 2026-06-18) primary government “successfully completed a zero-power fueled criticality demonstration”
- Categorical Exclusion Determination CX-271015 (DOE-ID-26-005), Valar Atomics Ward250 (U.S. Department of Energy, 2026-04-22) primary government “No refueling occurs during the operational mission.”
Valar's Nuclear Safety Design Agreement (October 2025) describes a lifecycle of about 18 months from authorization through decommissioning: a pre-operational phase, 12 months of nuclear operations in test campaigns, then defueling and decommissioning that returns the site to unrestricted use. DOE's environmental determination (22 April 2026) describes a 24-month research program: about 12 months of reactor operation, 6 months of in-vessel cooldown and 6 months of decommissioning, after which the single core of spent fuel goes in dry casks to an unnamed 'DOE-approved facility' (safe-023). DOE's agreement with Valar runs from October 2025 to 4 July 2027 (orig-055). If operations are counted from criticality in June 2026, the 12 months end around June 2027, and DOE's schedule puts the end of decommissioning around mid-2028; no record read gives the actual planned end date. Set beside this, Valar now describes the Utah site as permanent: its head of projects told the state trust-lands board the lab is 'no longer just a test facility' (ppl-006), it is buying the neighboring 112-acre parcel (gov-022), it was approved for a state tax credit that requires it to stay 10 years (fund-017), and its Castle Country page says 'we're ready to build more'. At the 1 July 2026 event Taylor said the fuel inside Ward 250 would let it keep running for 165 years (KSL/Deseret, 6 July); that describes the fuel's capacity at very low power, not the approved plan, which is about 12 months of operation with no refueling (DOE). The two are not necessarily in conflict (the test reactor can be removed while the company stays), but no public document says what replaces Ward 250 or whether Ward 250 will actually be torn down on the stated schedule.
- Ward250 Nuclear Safety Design Agreement, No. 100403, Rev 02 (October 2025), page 8 (Valar Atomics, 2025-10) primary company “a structured lifecycle spanning approximately 18 months from authorization through decommissioning”
- NEPA Determination DOE-ID-26-005: Valar Ward250 Research Reactor (U.S. Department of Energy, Office of Nuclear Energy, 2026-04-22) primary government “consisting of approximately 12 months of reactor operation followed by 6 months”
- Castle Country (Valar Atomics, 2026-09) primary company “We think of this as home, and we're ready to build more.”
- New partnership touts nuclear-powered AI with minimal water use (KSL.com (Eva Terry, Deseret News), 2026-07-06) news “The fuel inside the Ward250 will let it continue running for 165 years”
DOE's categorical exclusion describes the spent fuel as 'a single core loading' to be put in dry storage casks for transport to a 'DOE-approved facility', which it does not name; about 6 months of in-vessel cooldown and 6 months of decommissioning follow 12 months of operation. It estimates under 1 cubic metre a year of solid low-level waste (filters, clothing, small equipment) sent to a licensed disposal site, says no radioactive waste will be left on site after decommissioning, and says the site returns to unrestricted use. The NSDA says defueling will send spent fuel 'to appropriate storage' and decommissioning will return the site to unrestricted use. DOE-STD-1271 lists 'Responsibilities and Liabilities for Decommissioning and Disposition of Wastes' among the topics the DOE contract should cover; that contract (the OTA) is not public, and DOE's reactor-pilot release says companies bear all decommissioning costs (orig-041). Utah's 2026 law exempts interim storage of waste from a DOE-authorized test reactor at a state-owned facility from the state's high-level-waste ban, but only if the Division of Waste Management and Radiation Control permits and licenses it; no such permit or application naming Valar was found (csite-023). Where the spent fuel will go, when, and who pays if Valar cannot are not stated in any record read.
- NEPA Determination DOE-ID-26-005: Valar Ward250 Research Reactor (categorical exclusion B5.26) (U.S. Department of Energy, Office of Nuclear Energy (Idaho), 2026-04-22) primary government “dry storage casks for transport to DOE-approved facility”
- NEPA Determination DOE-ID-26-005: Valar Ward250 Research Reactor (categorical exclusion B5.26) (U.S. Department of Energy, Office of Nuclear Energy (Idaho), 2026-04-22) primary government “No radioactive waste will be left on site after decommissioning.”
- Ward250 Nuclear Safety Design Agreement, No. 100403, Rev 02 (status: Draft; issued for Public Release) (Valar Atomics, 2025-10) primary company “Facility decommissioning returns the site to unrestricted use”
- DOE-STD-1271-2025, Authorization Pathway for Nuclear Facilities (August 2025; DOE standard, copy posted by the Nuclear Innovation Alliance) (U.S. Department of Energy, Office of Nuclear Energy, 2025-08) primary government “Responsibilities and Liabilities for Decommissioning and Disposition of Wastes”
The categorical exclusion says routine discharge of liquid radioactive effluent is prohibited, with infrequent batch releases allowed only below DOE's derived concentration standards (NE O 458.1) and 'in accordance with local utility permits'; gaseous effluents are 'negligible'; HEPA-filtered ventilation keeps negative pressure; 'No Clean Air Act permits are required'; and the public dose limit is 100 millirem a year. The NSDA says radiological air emissions 'will be evaluated' for the EPA's radionuclide air standard (40 CFR 61 Subpart H), with EPA coordination through DOE's Idaho Operations Office, and promises environmental monitoring data sharing and 'Regular environmental reporting' to state agencies. The NSDA's continuous-monitoring list covers neutron flux (three channels), core outlet temperature, primary coolant pressure and area radiation levels, and it commits to real-time fission-product ('fission break') monitoring with shutdown required on high coolant activity; the CX describes that shutdown as automatic. No environmental monitoring results, EPA air-emission determination, utility discharge permit, or state report naming Ward 250 was found on DOE, EPA or Utah DEQ pages read as of 29 September 2026.
- NEPA Determination DOE-ID-26-005: Valar Ward250 Research Reactor (categorical exclusion B5.26) (U.S. Department of Energy, Office of Nuclear Energy (Idaho), 2026-04-22) primary government “Routine discharge of liquid radioactive effluent is prohibited.”
- NEPA Determination DOE-ID-26-005: Valar Ward250 Research Reactor (categorical exclusion B5.26) (U.S. Department of Energy, Office of Nuclear Energy (Idaho), 2026-04-22) primary government “No Clean Air Act permits are required.”
- Ward250 Nuclear Safety Design Agreement, No. 100403, Rev 02 (status: Draft; issued for Public Release) (Valar Atomics, 2025-10) primary company “Radiological air emissions will be evaluated for compliance with 40 CFR 61 Subpart H”
- Ward250 Nuclear Safety Design Agreement, No. 100403, Rev 02 (status: Draft; issued for Public Release) (Valar Atomics, 2025-10) primary company “Regular environmental reporting maintains transparency with state environmental agencies.”
- NEPA Determination DOE-ID-26-005: Valar Ward250 Research Reactor (categorical exclusion B5.26) (U.S. Department of Energy, Office of Nuclear Energy (Idaho), 2026-04-22) primary government “with automatic reactor shutdown on detection of elevated primary coolant activity”
Castle Valley Special Service District (CVSSD) runs water and sewer for Castle Valley towns including Orangeville. Its approved minutes of 19 February 2026 record Valar's Jess Housekeeper presenting Valar's plans (by video), the board approving a $20,000 outside-district water connection for Valar contingent on all water shares being submitted to Orangeville, and the manager reporting that Valar 'will be required to apply to' the state Division of Water Quality (DWQ) for a sewer discharge permit, which DWQ would administer for four years, and that no sewer connection would be approved until DWQ approved the permit. The approved minutes of 19 March 2026 (whose opening line misdates the meeting to 19 February) record the manager's update: sewer plans 'were not submitted to the State as required', water service work was paused pending DWQ approval, 'Valar tied into the county sewer system without prior authorization', Valar was asking for ordinary sanitary sewer service for restrooms only with no process water, a site visit with the regional DEQ engineer was planned, and water service would not be provided until all sewer permits and approvals were in place; no action was taken. The district's May, July and August 2026 minutes (read; the June minutes, approved on 16 July, are not posted) do not return to the sewer issue, though the May minutes discuss annexing property near Orangeville 'that may be developed by Valor', and its 17 September agenda lists no Valar item. DOE's categorical exclusion puts water use under 1,000 gallons a day for domestic use, with no process-water discharges (safe-021), which matches the restrooms-only request. Whether DWQ issued a permit, and whether the tie-in the minutes report was corrected or penalized, is not in any record read.
- CVSSD Regular Meeting Minutes, February 19, 2026 (approved) (Castle Valley Special Service District, 2026-02-19) primary government “Valor will be required to apply to DWQ for a sewer discharge permit.”
- CVSSD Regular Meeting Minutes, March 19, 2026 (approved) (Castle Valley Special Service District, 2026-03-19) primary government “Valar tied into the county sewer system without prior authorization”
- CVSSD Regular Meeting Minutes, May 21, 2026 (approved; scanned, read as page images) (Castle Valley Special Service District, 2026-05-21) primary government
- CVSSD Regular Meeting Minutes, July 16, 2026 (approved; scanned, read as page images) (Castle Valley Special Service District, 2026-07-16) primary government
- CVSSD Board Meeting Minutes, August 20, 2026 (approved) (Castle Valley Special Service District, 2026-08-20) primary government
- Castle Valley Special Service District Board of Directors (public body 1361): notices June 2025 to September 2026 (Utah Public Notice Website) primary government
- CVSSD Notice of Regular Board Meeting, September 17, 2026 (agenda) (Castle Valley Special Service District, 2026-09-17) primary government
Reactor: built and heat-tested in Hawthorne, California (plan-008); loaded unfueled onto a C-17 at March Air Reserve Base on 15 February 2026 and flown to Hill Air Force Base, Utah, with the Energy Secretary and a Defense under secretary aboard (World Nuclear News, 18 February); from Hill it went 'by road' to Emery County (Valar's Castle Country page). No route, date or oversize-load permit for the road leg was found. Core test: the NOVA core was assembled and run at the National Criticality Experiments Research Center, Nevada, in November 2025 (orig-008). Fuel: World Nuclear News, citing Reuters, reported the Energy Secretary saying the fuel would move separately from the Nevada National Security Site; DOE's May 2026 packaging approval covers up to 24 single-block packages from NCERC to the Ward 250 site until 30 June 2027 (plan-014, safe-010, safe-012). Neither DOE document gives shipping dates, route or mode, and no state or county notice of a shipment was found (safe-012). Spent fuel: one core, to go in dry casks to an unnamed DOE-approved facility after operations (safe-023); Utah's July 2026 pact with DOE separately contemplates a campus that could accept out-of-state spent fuel (gov-030). For scale, World Nuclear News called the airlifted unit 'the 5 MW Ward250' able to power about 5,000 homes, without saying whether 5 MW means heat or electricity; Ward 250's safety papers limit it to 100 kW of heat, at most one-fiftieth of that, and it is not built to supply the grid (orig-031, plan-018).
- US microreactor transported by air (World Nuclear News, 2026-02-18) news “Fuel for the reactor will be transported separately from the Nevada National Security site”
- Castle Country (Valar Atomics, 2026-09) primary company “From Hill Air Force Base it came here, by road, to Emery County.”
- Safety Evaluation Report, Letter Amendment of Certificate of Compliance No. 9979, Revision 20 (Valar Atomics fuel elements) (U.S. Department of Energy, Packaging Certification Program, 2026-05-20) primary government “This authorization expires on June 30, 2027, or at completion of shipments”
- NEPA Determination DOE-ID-26-005: Valar Ward250 Research Reactor (U.S. Department of Energy, Office of Nuclear Energy, 2026-04-22) primary government “Spent fuel will be transferred to dry storage for transport to a DOE-approved facility.”
Ward 250 is not built to supply the grid: its July 2026 electricity demonstration used a thermoelectric generator and ran one server (ETV; plan-010). The next step Valar has shown is a heat-to-electricity program. On 11 February 2026 the Utah Energy Research Board heard a Valar proposal, presented by the lab director, to build a 10 MW (thermal) natural-gas-powered heater at the lab to test supercritical-CO2 power generation; Valar would fund the whole $20 million, the equipment would become lab property, and Valar asked for completion by June 2026. The board approved only a $400,000 'Phase 1' of design and planning, to re-evaluate before construction (gov-014). No Phase 2 approval, air permit or completion was found. Valar's job board (29 September 2026) has eight turbomachinery roles in Torrance for a 'secondary loop Brayton cycle' on helium, supercritical CO2 or air, with 'a purpose-built test facility program' (plan-011); the posts do not say where that facility will be. DOE's environmental review of Ward 250 says 'No combustion processes occur' at the reactor; a gas-fired heater at the same lab would be a separate project with its own review, and none was found.
- Utah Energy Research Board Meeting Minutes, February 11, 2026 (Utah Energy Research Board, via Utah Public Notice Website, 2026-02-11) primary government “Valor requested an aggressive completion date of June 2026.”
- Director Instrumentation, Control, and Electrical - Power Conversion (Torrance, California) (Valar Atomics (via Greenhouse), 2026-06-30) primary company “secondary loop Brayton cycle”
- NEPA Determination DOE-ID-26-005: Valar Ward250 Research Reactor (U.S. Department of Energy, Office of Nuclear Energy, 2026-04-22) primary government “No combustion processes occur.”
- Emery County takes center stage as Valar and Nvidia power historic breakthrough (ETV News (Kevin Butler), 2026-07-01) news “converted into electricity through a thermoelectric generator”
The state lab and Valar's joint update of 23 January 2026 (run by ETV) says site work for the Ward 250 reactor and the fuel fabrication facility included earthmoving and crushing of about 40,000 cubic yards by TSJ Construction, blasting by 3 Rivers Blasting under contract to TSJ, and more than 4,000 cubic yards of foundation concrete from Nelson's Construction; the lab added cameras, access controls, a planned security checkpoint and a new perimeter fence. The Utah Energy Research Board heard on 11 February 2026 that Valar was 'on track' for its July 4 goal and that the reactor vessel was due at the site shortly; the unfueled reactor arrived by air at Hill AFB on 15 February and then by road (orig-030). DOE's April 2026 environmental review describes construction in the past tense (plan-004). Earlier records name Kiewit (engineering and construction), Goree (design) and Sprung (building) (orig-067); Emery County's commission itself voted the building permit because the county building department had not issued one (gov-021); a utility district recorded an unauthorized sewer tie-in (loc-015); the State Fire Marshal declined the fire review (loc-018). No record read says the fuel building is finished.
- Rapid construction from local contractors at Valar Atomics (USREL press release, Energy Corner) (Utah San Rafael Energy Lab and Valar Atomics, via ETV News, 2026-01-23) primary government “moved and crushed approximately 40,000 cubic yards of material”
- Utah Energy Research Board Meeting Minutes, February 11, 2026 (Utah Energy Research Board, via Utah Public Notice Website, 2026-02-11) primary government “The reactor vessel is scheduled to arrive at the site shortly.”
Valar's Nuclear Safety Design Agreement for Ward 250 (document 100403 rev 02, October 2025, marked 'Draft' and 'issued for Public Release'; the company says DOE approved it) lists key design parameters: 100 kWth continuous as the license limit, up to 250 kWth for limited tests; TRISO-coated UCO fuel qualified on the AGR program basis; helium coolant at 3.0 MPa; 250 C inlet and 650 C nominal core outlet; a 1.8 m by 1.5 m core of 76 fuel elements holding about 250 kg of heavy metal; 4.95% U-235 enrichment; graphite reflector. It sets a 12-month operating period and an 18-month lifecycle ending in decommissioning and return of the site to unrestricted use, with DOE authorization only and no planned NRC licensing. At a July 2025 Emery County town hall the name was explained as a reference to the nation's 250th birthday on July 4, 2026 (orig-045); the 250 kWth test ceiling is a separate figure.
- Ward250 Nuclear Safety Design Agreement (Document 100403, Rev. 02) (Valar Atomics, 2025-10) primary filing “a ≤250 kWth High Temperature Gas-cooled Reactor (HTGR) research facility”
- Ward250 Nuclear Safety Design Agreement (Valar Atomics, 2025-10-13) primary company “The Department of Energy has approved the Nuclear Safety Design Agreement (NSDA)”
Valar's NSDA (October 2025) says Ward 250 directly uses hardware that has undergone full-scale testing, that design work focuses on nuclear-specific modifications to the proven WardZero configuration, and it credits Ward Zero testing for key safety points: natural circulation during a loss of coolant flow, and the capacity of the Reactor Cavity Cooling System. It also asks DOE to accept the final safety analysis at 90% design completion because the WardZero program has completed design, installation and testing of major safety-significant systems. Valar's QA Program Description, which Valar's October 13, 2025 post says DOE approved, has a section on using existing WardZero hardware: Ward Zero components may go into Ward 250 if they stay traceable and are evaluated, and Ward Zero operating data may count as design verification by comparison to 'similar proven systems'. Ward Zero was completed in February 2025 (orig-005), before that QA program was approved. Valar's June 2026 draft says the reactor underwent non-nuclear testing at its Hawthorne headquarters above 750 C and 6 MPa before shipment (orig-035). No Ward Zero test report, data set or DOE review of it has been published, and the page titled 'Ward Zero Whitepaper' holds no Ward Zero data (orig-058). Whether DOE examined the Ward Zero data would be shown by the non-public PDSA and DSA (safe-007).
- Ward250 Nuclear Safety Design Agreement, No. 100403, Rev 02 (status: Draft; issued for Public Release) (Valar Atomics, 2025-10) primary filing “natural circulation capabilities demonstrated during WardZero testing”
- Ward250 San Rafael Facility Quality Assurance Program Description, No. 100474, Rev 02 (Valar Atomics, 2025-10) primary filing “Ward250 incorporates proven hardware designs and components from the WardZero facility.”
- Valar Atomics Quality Assurance Program Description (library post; not listed in Valar's library) (Valar Atomics, 2025-10-13) primary company “defines quality controls for integrating existing WardZero hardware components into the Ward250 design.”
- Ward 250 By the Numbers (unlisted draft page) (Valar Atomics, 2026-06-28) primary company “underwent extremely rigorous non-nuclear testing at our headquarters in Hawthorne, CA”
Valar's Quality Assurance Program Description (October 2025, status 'Approved'; the only published Valar document read that covers the fuel plant) treats the Ward250 reactor and the 'Valarin Fuel Fabrication Facility' as one 'VASR Facility' and scales its quality rules to the facility's 'limited operational duration of approximately 12 months' and 'low hazard category', with full implementation required before fuel receipt. It says the fuel lab will make TRISO particles in graphite compacts using German HOBEG methods and is designed to stay below DOE Hazard Category 3 (orig-038, safe-031). Set beside this: on 11 June 2026 Valar's representative told Orangeville the second building will make Valar 'the largest manufacturer of this fuel in the United States' once completed; July 2026 job posts describe 'pilot scale uranium processing equipment' and a process that 'transitions into production' (loc-019); DOE's program page still lists Valar's fuel-line selection (30 September 2025) as conditional, with no later status; POWER (25 August 2026), listing Valar among 13 projects added to DOE's Nuclear Energy Launch Pad, says Valar is developing a 'co-located Valarin facility' for TRISO particles and compacts, and notes that project scopes were not disclosed. No NSDA, safety analysis, DOE authorization or state license for the fuel plant has been published (safe-031), and no public document says how much uranium it may hold or produce. A quality program sized for a 12-month demonstration is a different thing from a production plant; the record does not show which rules would apply to production. The quality program gives no uranium inventory, enrichment or threshold for its <HC3 claim, and the safety agreement never mentions the fuel facility (it categorizes only the reactor, as Hazard Category 2), so the claim cannot be checked from Valar's public papers.
- Ward250 San Rafael Facility Quality Assurance Program Description, No. 100474, Rev 02 (October 2025) (Valar Atomics, 2025-10) primary company “limited operational duration of approximately 12 months”
- Orangeville City Council Regular Meeting Minutes, June 11, 2026 (Orangeville City, via Utah Public Notice Website, 2026-06-11) primary government “Once completed they will be the largest manufacturer of this fuel”
- TRISO Chemical Plant Process Engineer (Orangeville, Utah) (Valar Atomics (via Greenhouse), 2026-07-16) primary company
- Energy Department Fuel Line Pilot Program (U.S. Department of Energy, Office of Nuclear Energy, 2026-02-12) primary government
- NRIC Adds 13 Projects to Nuclear Energy Launch Pad (POWER Magazine (Sonal C. Patel), 2026-08-25) news “co-located Valarin facility to fabricate TRISO fuel particles and graphite compacts”
- Valar Atomics job board (public Greenhouse feed, 92 postings): Chemical Vapor Deposition Engineer (TRISO), Orangeville (Valar Atomics (via Greenhouse), 2026-07-31) primary company “as the process transitions into production”
In the NSDA's Maximum Hypothetical Accident analysis (pages 34-36), the radioactive inventory is based on 'OpenMC neutronic analysis with 3 MWd total burnup' and 'Conservative 30 EFPD operation assumed for inventory buildup' (30 effective full-power days at 100 kW is 3 megawatt-days). Earlier (page 10) the NSDA says the analysis assumes operation at maximum licensed power long enough to reach equilibrium inventories. Its operating limits (page 25) set 'Fuel burnup limit: 30 megawatt-days', and its objectives call for 12 months of operation with availability above 80% and steady operation up to 250 kWth (page 8). The limit is ten times the burnup the accident inventory was built on. Valar's July 2025 county presentation (orig-045) and its June 2026 draft post (safe-008) both describe 30 effective full-power days, which matches the accident analysis rather than the 30 MWd limit. The lifecycle also differs: the NSDA gives about 18 months 'from authorization through decommissioning', DOE's categorical exclusion a 24-month program (12 months of operation, 6 of cooldown, 6 of decommissioning). The approved DSA, which would fix the inventory and limits, is not public. Our check using standard half-lives: going from 3 to 30 MWd at the same power would raise iodine-131 by about 8% and the iodine and noble-gas dose by about 4%; cesium-137 and strontium-90 would grow about tenfold but stay about 4% of the iodine-131 activity. The NSDA's 18 months is also shorter than its own schedule: Table 7's dates plus 12 months of operation already exceed 18 months before any decommissioning, unless counted from startup.
- Ward250 Nuclear Safety Design Agreement, No. 100403, Rev 02 (status: Draft; issued for Public Release) (Valar Atomics, 2025-10) primary company “Conservative 30 EFPD operation assumed for inventory buildup”
- Ward250 Nuclear Safety Design Agreement, No. 100403, Rev 02 (status: Draft; issued for Public Release) (Valar Atomics, 2025-10) primary company “Fuel burnup limit: 30 megawatt-days”
- NEPA Determination DOE-ID-26-005: Valar Ward250 Research Reactor (categorical exclusion B5.26) (U.S. Department of Energy, Office of Nuclear Energy (Idaho), 2026-04-22) primary government “approximately 12 months of reactor operation followed by 6 months of in-vessel cooldown”
- Ward 250 By the Numbers (unlisted company page with placeholders, signed Isaiah Taylor) (Valar Atomics (Isaiah Taylor), 2026-06-28) primary company
The NSDA's code of record lists DOE's worker safety and health rule, 10 CFR 851, as 'N/A', replaced by OSHA standards (29 CFR 1910/1926) under the contractor-owned model; a second table gives its applicability as 'Phased' and notes a 'DOE Idaho Operations Office exemption request in process for construction activities' pending a revision of 10 CFR 851, and Appendix C.4 says the OSHA approach for the construction phase was 'approved through the OTA' (Valar's statement; no DOE record of it was read). DOE-STD-1271, for its part, says that in some instances, such as worker industrial safety, DOE authorization is exempted from OSHA requirements. Neither document says which agency inspects or enforces worker safety at Ward 250 if DOE's rule is set aside and OSHA's own requirements do not reach a DOE-authorized facility. Radiation protection stays under DOE's rule 10 CFR 835 (occupational limit 5 rem a year), per the NSDA and the categorical exclusion. Minimum staffing in the NSDA: one Senior Reactor Operator and one Reactor Operator per shift, a 'Radiation Protection Technician: On-call', plus a facility director, a technical support engineer and a maintenance technician. Operators are qualified under the ANS-15.4 research-reactor standard instead of DOE's review (Appendix C.2); no NRC operator licences are involved, though Valar's documents call them 'licensed operators'. Valar's QA program says its Radiation Safety Lead function 'may be fulfilled by qualified USREL personnel under appropriate agreements'; the state lab advertised for its own Safety Manager in September 2026 (dir-006). Whether DOE granted the 10 CFR 851 exemption, and what applies to workers after construction, is not in any DOE record read.
- Ward250 Nuclear Safety Design Agreement, No. 100403, Rev 02 (status: Draft; issued for Public Release) (Valar Atomics, 2025-10) primary company “DOE Idaho Operations Office exemption request in process for construction activities”
- Ward250 Nuclear Safety Design Agreement, No. 100403, Rev 02 (status: Draft; issued for Public Release) (Valar Atomics, 2025-10) primary company “Radiation Protection Technician: On-call”
- Ward250 San Rafael Facility Quality Assurance Program Description, No. 100474, Rev 02 (status: Approved) (Valar Atomics, 2025-10) primary company “This function may be fulfilled by qualified USREL personnel under appropriate agreements.”
- DOE-STD-1271-2025, Authorization Pathway for Nuclear Facilities (August 2025; DOE standard, copy posted by the Nuclear Innovation Alliance) (U.S. Department of Energy, Office of Nuclear Energy, 2025-08) primary government
- NEPA Determination DOE-ID-26-005: Valar Ward250 Research Reactor (categorical exclusion B5.26) (U.S. Department of Energy, Office of Nuclear Energy (Idaho), 2026-04-22) primary government
Valar's Quality Assurance Program Description (document 100474 rev 02, October 2025, status 'Approved') applies ANSI/ANS-15.8-1995, the research-reactor QA standard, instead of the nuclear industry's NQA-1, which Valar's summary says DOE approved (safe-005). It covers both Ward 250 and the 'Valarin' fuel fabrication facility, together the 'VASR Facility'. It allows 'more modern and efficient computational codes for HTGR applications' to be used 'prior to their complete validation', relying on safety margins, with Ward 250's data to validate them. It permits design verification by people 'from the same organization' and by comparison with the non-nuclear WardZero prototype, and requires an independent QA assessment before fuel loading. The published 'Approved' document contains many unresolved editing marks: merged words ('Comprehensive Ddesign', 'VTalar Atomics', 'Valar AtomicsValarin'), sentences printed twice in old and new wording, and 'Figure 11: VSAR Facility' for 'Figure 1: VASR'. The document says it becomes effective on approval by Valar's own facility director and president, so 'Approved' marks internal approval. The NSDA separately says fuel particles are manufactured under an NQA-1 program. Whether the pre-fuel-load independent QA assessment took place, and by whom, is not public. The safety agreement's case for ANS-15.8 says the standard covers all 18 criteria of 10 CFR 830.122 (pp.49, 54); that rule lists 10 criteria, and 18 is the count in the NRC's Appendix B that NQA-1 follows (exp-025).
- Ward250 San Rafael Facility Quality Assurance Program Description, No. 100474, Rev 02 (status: Approved) (Valar Atomics, 2025-10) primary company “may be used prior to their complete validation”
- Ward250 San Rafael Facility Quality Assurance Program Description, No. 100474, Rev 02 (status: Approved) (Valar Atomics, 2025-10) primary company “Comprehensive Ddesign control processes”
- Ward250 Nuclear Safety Design Agreement, No. 100403, Rev 02 (status: Draft; issued for Public Release) (Valar Atomics, 2025-10) primary company “Manufacturing under NQA-1 quality program”
- Ward250 San Rafael Facility Quality Assurance Program Description, No. 100474, Rev 02 (status: Approved) (Valar Atomics, 2025-10) primary company “becomes effective upon approval by the VASR Facility Director and Valar Atomics President”
Table 7 of Valar's Nuclear Safety Design Agreement (October 2025, page 53) set these targets: NSDA submittal 22 Sept 2025 (status 'In Review'), preliminary safety analysis (PDSA) 1 Nov 2025, final safety analysis (DSA) 6 Jan 2026, each with a 45-day DOE review; construction complete 13 April 2026; phased readiness review; initial criticality 30 June 2026. The record: DOE's PDSA approval is known only from POWER's report linking to Valar's own posts, as February 2026, and final DSA approval as 23 April 2026 (safe-006); set against the table's submittal dates plus the 45-day reviews (about mid-December 2025 and about 20 February 2026), each came roughly two months later; the reactor was flown in unfueled on 15 February 2026 (orig-030); DOE's environmental determination was signed 22 April 2026 and speaks of construction in the past tense; DOE approved the fuel-shipping package on 20 May 2026 (safe-010); Valar told the state lab board in May that DOE's readiness team had reviewed it (gov-037); DOE announced criticality on 18 June 2026 (orig-010), 12 days before the table's 30 June target (plan-005 on the exact date). The promise that mattered most publicly, criticality before 4 July 2026, holds (fund-020). None of the DOE approvals themselves (PDSA, DSA, safety requirements, readiness report, startup approval) has been published (safe-007).
- Ward250 Nuclear Safety Design Agreement, No. 100403, Rev 02, Appendix B, Table 7: Project Milestones (Valar Atomics, 2025-10) primary company “Initial Criticality 06/30/2026”
- NEPA Determination DOE-ID-26-005: Valar Ward250 Research Reactor (U.S. Department of Energy, Office of Nuclear Energy, 2026-04-22) primary government “Construction was confined to the existing USREL site with minimally invasive excavation.”
- Department of Energy Celebrates Second Advanced Reactor Achieving Criticality (U.S. Department of Energy, 2026-06-18) primary government
Valar's mission page lists Kip Mock as Head of Operations. Deseret News (Mar 2026) reports that Mock co-founded the Moscow, Idaho auto shop with Taylor, ran it for about a year and a half while Taylor paid the bills from a software job, sold his shares when Valar began, joined Valar about six months after its July 2023 founding after founding another company, and says college degrees are not a strict hiring requirement ('Isaiah dropped out, I dropped out'). Mother Jones (Feb 2026) and the Utah Investigative Journalism Project (July 2025) report he was heading the Philippines reactor project (orig-018); Mother Jones counts him among leaders who 'appear to have as little nuclear experience as Taylor' (its assessment). No nuclear-industry background for Mock appears in any source read. Mock's current duties under the Ward 250 quality plan are not stated in the public documents, which name roles, not people.
- At just 27 years old, this entrepreneur is remaking America's energy industry (Eva Terry) (Deseret News, 2026-03-17) news “Isaiah dropped out, I dropped out”
- Mother Jones (Kiera Butler), 26 Feb 2026 (May+June 2026 issue) (Mother Jones, 2026-02-26) news “appear to have as little nuclear experience as Taylor”
- Who is Valar Atomics? (Eric Peterson) (The Utah Investigative Journalism Project, 2025-07-08) news
- Mission | Valar Atomics (Valar Atomics) primary company “Kip Mock Head of Operations”