VALAR WATCH
Key findingsTheir claims, annotatedEvidenceTake action
374 facts · 512 sources · updated 2026-09-30

Fact csite-003

newrecordconfirmed What is already on the parcel: fiber, power line and county-road easements, a grazing permit, a Guard training lease
2026-09-17 · csite-003 · Utah Trust Lands Administration, Utah National Guard, Valar Atomics

Per the September memorandum, current authorizations on Section 16 include easements for fiber optic lines, a power line and a county road, a livestock grazing permit (GP 22396) and a special use lease to the Utah National Guard (SULA 1321) on the south-east quarter (160 acres). The Guard lease lets engineering battalions train in maneuvers, mobility and survival; they 'may construct bunkers and ditches, etc., but may not discharge munitions', and there are no structures on it. Staff are working with the Guard to move that lease so Valar can take the whole section; the costliest part is expected to be a cultural-resource survey of the new site, paid for by Valar. The grazing permit would be ended before construction, with 'as much notice as possible' to the permittee. The memo does not say which county road crosses the parcel or name the easement holders. The state's RDCC records show the Guard lease (SULA 1321) was reviewed there in 2001 (csite-032). Two state records give different figures for what the section earns now: the memo says about $4,000 a year, while the approved August minutes record staff telling a trustee about $4,000 a month from the Utah National Guard.

In plain termsThe square mile is not empty land on paper. A county road, a power line and fiber-optic cables already have rights to cross it, a rancher grazes it, and the National Guard trains on one corner. Any of these can leave survey stakes or posts on this section. A posted Valar mining-claim notice is for Section 28, two miles south (csite-019).
verified 2026-09-29: Holds. Re-read 2026-09-29: memo pp. 19-20 (Subject Property); quote exact. Second check 29 Sept 2026: added the income discrepancy between memo p. 26 ('per year') and the August final minutes p. 6 ('per month'); both quotes exact.

In tabs: carbon_site, local · file carbon_site