VALAR WATCH
Key findingsTheir claims, annotatedEvidenceTake action
374 facts · 512 sources · updated 2026-09-30

Fact dir-027

newrecordconfirmed The CNPS fuel: 1980s General Atomics TRISO compacts, 19.9% average enrichment, kept at NCERC; LANL says they were crumbling
2025-06-18 · dir-027 · Los Alamos National Laboratory, General Atomics, National Criticality Experiments Research Center

LANL's peer-reviewed Deimos design paper (Trellue et al., Nuclear Technology, published online 18 June 2025; accepted manuscript on DOE's OSTI) gives this history. The HALEU TRISO fuel was used in the 1980s Compact Nuclear Power Source (CNPS) critical experiment at Los Alamos and stayed in storage at Los Alamos until the 2000s, when it moved to NCERC in Nevada. LANL unpacked and reused it for the Deimos experiment in September 2024. The paper describes the kernels as 'CNPS fuel fabricated by General Atomics', uranium oxycarbide (UC0.3O1.7) at an average enrichment of 19.9% U-235. The compacts average 0.6214 cm in radius and 4.9426 cm long (called '2-in.' compacts) and weigh 14.73 g. Graphite cups about 95 cm long each hold nineteen compacts, and each cup held about 130 g of HALEU. Because of the fuel's unusually high particle packing, 'the compacts were crumbling and losing the small TRISO spheres', so they were placed in the graphite cups to protect them. The paper says extensive characterization was under way to verify the documented values. It does not mention Valar, and it does not say who owns the fuel. (Updates plan-014.)

In plain termsThe fuel Los Alamos used in these Nevada tests was made by General Atomics for a 1980s experiment: tiny coated uranium beads pressed into cylinders about two inches long. Its enrichment averages 19.9%, just under the 20% line. Los Alamos reported that the old cylinders were crumbling and had to be put in protective graphite tubes.
verified 2026-09-30: Skeptic pass 2026-09-30: re-downloaded the manuscript (31,860,069 bytes; OSTI robots allows /pages/servlets/purl) and re-read Sec. I, Sec. II, Table I and the Sec. III cup lines; all quotes exact; zero mentions of Valar. Fixed: the compacts were 'placed in', not 'sealed in', graphite cups; added the cup length. Received 31 Jan 2025, accepted 4 May 2025, published online 18 Jun 2025. The paper gives no total count of CNPS compacts. Renumbered from a duplicate 'dir-019'.

In tabs: safety, government · file claude_direct