Fact orig-012

newanalysisconfirmed Utah's energy-lab page calls June 18 'full-power' criticality; DOE and ANS called it zero-power
undated · orig-012 · Utah San Rafael Energy Lab, Utah Office of Energy Development, Valar Atomics, U.S. Department of Energy

The Utah San Rafael Energy Lab's project page (a State of Utah site, read 2026-09-29) says Ward 250 achieved 'full-power fueled criticality' on June 18, 2026, describes it as a Generation IV helium-cooled, graphite-moderated HTGR, and says the design is meant to scale to a 5 MW version. DOE's release and ANS both describe June 18 as a zero-power criticality demonstration, and Valar's own Castle Country page says full power came 'days later'. The state page's wording therefore conflicts with the federal record; it also repeats the company-style claim that the fuel is 'impossible to melt', which is a design claim, not a demonstrated result.

In plain termsUtah's own lab web page says the reactor reached 'full-power' criticality on June 18. The federal record says it was a zero-power test that day, and even Valar says full power came days later. The state page overstates what happened on June 18.
verified 2026-09-29: Verify pass 2 (2026-09-29): Utah lab page re-read 2026-09-29: still says 'full-power fueled criticality' on June 18, 5 MW scale-up and 'impossible to melt'; DOE release says zero-power. Conflict stands.