Fact orig-017

newcompany claimreported Design lineage: 'Ward One' was a 100 kWt TRISO HTGR planned for under a month of operation
2025-04-07 · orig-017 · Valar Atomics, Isaiah Taylor, Ward One

The April 2025 lawsuit post describes Ward One as a 100 kWt high-temperature gas reactor using TRISO fuel, named, the founder writes, after a Manhattan Project-era relative of his, with a planned operating life of less than a month. It says the design relies on strong negative thermal reactivity feedback and low power density for fully passive decay-heat removal, and claims that holding its spent fuel for five minutes would give the same radiation exposure as a CAT (CT) scan. The later Ward 250 carries the same 100 kWt figure (orig-011, orig-034), which suggests Ward 250 grew out of the Ward One concept, though no source read says so directly. Ward One itself was still unbuilt in the Philippines as of April 2026 (orig-064). For scale: a CT scan is about 1 to 10 millisieverts (FDA), so five minutes would need 12 to 120 millisieverts an hour; the post gives no amount of fuel, cooling time, distance or shielding.

In plain termsWard One was Valar's first planned uranium reactor: very small (100 kilowatts of heat) and meant to run for less than a month. It was to be built in the Philippines; as of April 2026 it had not been built there (orig-064).
verified 2026-09-29: Verify pass 2 (2026-09-29): post re-read; 100 kWt, TRISO, under-a-month life, passive decay-heat wording and the spent-fuel claim match (the post says 'CAT scan'). Quote exact; relative still unnamed. Correction 2026-09-29 (calculation audit): added the CT-scan dose-rate scale (12-120 mSv/h over five minutes). Correction 2026-09-30 (source objectivity review): reworded the detail.