Fact orig-018

newcompany claimreported In April 2025 Valar said it would build and test Ward One in the Philippines because of NRC rules
2025-04-07 · orig-018 · Valar Atomics, Philippine Nuclear Research Institute

The same April 2025 post says Utah, Texas and other states had expressed interest in hosting the test reactor, but that because the NRC had not exempted small test reactors, Valar was building and testing it in the Philippines instead. Four months later (August 2025) DOE's pilot selection gave Valar a U.S. path, and its first reactor to be built, Ward 250, went to Utah instead (orig-006); Ward One stayed a Philippine plan. The November 2025 NOVA release still lists the Philippine partnership, and ANS reported that month that Ward One was slated to be built there by a Philippine-incorporated Valar subsidiary. Set beside the record: as of April 2026, Philippine reporting says the reactor had not been built and the project was still seeking approval to use a site on University of the Philippines land (orig-064).

In plain termsIn April 2025 Valar said U.S. rules pushed it to test its first reactor abroad, in the Philippines. Four months later the U.S. government opened a faster DOE path and the first reactor went to Utah instead. The Philippine project was still waiting on a site approval in April 2026 (orig-064).
verified 2026-09-29: Verify pass 2 (2026-09-29): post and NOVA release re-read; ANS's November 2025 report, cited in the detail but missing from sources, added. Wording fixed: Ward One did not move to Utah; a different reactor (Ward 250) was built there.

In tabs: overview, timeline, plans · file origins