Fact orig-074
Does not hold, or conflicts with the record: 'first company ever to take a nuclear reactor critical outside of a national lab' (General Atomics did so in 1958; ppl-030, orig-066); electricity 'just a week later', actually thirteen days by Valar's own dates (orig-070); the spent-fuel 'CT scan' claim, which engineers calculated to be a fatal dose as press reports describe (their inputs, such as distance and cooling time, are not in the record read; the worked check on the Proofs page, pf-007, gives about 75 to 334 mSv whole-body for all the spent fuel held 50 cm from the body a day after shutdown, and less than a CT scan for one pebble, on partly assumed inputs; the two rest on different assumptions and are not directly comparable), still posted and since tagged to ask search engines not to list it (safe-026, orig-061); fuel listed as 4.95% in the safety agreement but HALEU in DOE's shipping review (orig-040, disc-001). Official statements that did not match the record: Utah's lab page calling June 18 'full-power' criticality (orig-012); the governor's 2025 description of NRC oversight (orig-065). Not borne out as of 2026: 'we are building and testing this reactor in the Philippines' (April 2025), with no reactor built there a year later (orig-018, orig-064). Holds only narrowly: 'first startup to split the atom' (a Los Alamos-run test; orig-047); 'record time' (true from the Utah groundbreaking, not for the reactor hardware; orig-060); 'no burden on our water supply' (true for reactor cooling, not the wider campus; orig-070). Holds: DOE selection and criticality before July 4, 2026 (orig-006, orig-010); 'seven months' to criticality, counted from the Nevada core test (orig-015); 'first-ever C-17 airlift of a nuclear reactor' as worded (orig-066); the unfueled airlift (orig-030); the funding announcements, as reported (orig-057); Delaware incorporation (orig-051). Unsupported in public: Ward Zero test results the safety case relies on, with the only 'whitepaper' page holding the text of a 2019 essay by another author, not Ward Zero data (orig-058, orig-059); hydrogen and synthetic-fuel production (orig-063). Cannot be checked yet: the July 4, 2023 founding date (orig-053); the power Ward 250 reached (orig-013); 'world's first binding Coordinated Research Project' with PNRI (orig-064); that Ward One is named in the NRC lawsuit (safe-028); who made the fuel (orig-032). Changed over time: from a 12-month test in a temporary facility to a permanent fuel-and-reactor base and a Carbon County campus (orig-045, mine-019); from fuel synthesis to AI power (orig-063). Public dealing on Carbon County: Valar has spoken of Carbon County only in general terms, and none of its own publications names the Wellington site or the claim it staked (orig-075). Each gap is stated as a gap; none of this shows intent.
- Announcing our $1B Series B Led By Sequoia (Isaiah Taylor) (Valar Atomics, 2026-08-04) primary company
- Valar Atomics is Suing the NRC (Isaiah Taylor) (Valar Atomics, 2025-04-07) primary company
- Castle Country | Valar Atomics (Valar Atomics) primary company
- TRIGA International - History of Training Research Isotope production General Atomics (conference abstract, 2008) (U.S. DOE Office of Scientific and Technical Information (ETDEWEB), 2008-10-29) analysis
In tabs: overview · file origins