Fact plan-010
At the 1 July 2026 event at the Orangeville site (orig-042), ETV reported that Valar's Max Ukropina and NVIDIA representatives 'discussed a collaboration to explore' nuclear-powered AI factories, including a proposed 30-megawatt facility in Emery County, and that the reactor was raised to 37% power to supply electricity to a server hosting a website. KSL/Deseret (6 July) wrote that the companies are 'exploring the deployment' of a 30 MW data center fully powered by their reactor. Valar's Series B post (4 August) calls it 'a collaboration on a waterless 30 MW AI factory'. No contract, memorandum or NVIDIA release was found: a search of nvidia.com returned nothing on Valar, and no filing names a Valar-NVIDIA agreement. In July Valar told the state economic board of 'a waterless data center in Orangeville' (gov-033); in June its public-affairs representative told Orangeville the reactor's energy has no set purchaser (loc-016). Scale: 30 MW is 300 times Ward 250's 100 kW heat rating, and more than that in electricity, since only part of the heat becomes electricity. No reactor Valar has built or had authorized could supply it; it would take a fleet or much larger reactors, which for sold power would need NRC licensing (csite-010, safe-030). If ETV's 37% is of the 100 kW rating, the demonstration ran at roughly 37 kW of heat, and ETV says the electricity came from a thermoelectric generator, which turns only part of the heat into electricity; KSL/Deseret's line that the reactor 'is now generating 100 kilowatts of electricity' (orig-042) fits neither figure.
- Emery County takes center stage as Valar and Nvidia power historic breakthrough (ETV News (Kevin Butler), 2026-07-01) news “discussed a collaboration to explore nuclear-powered AI factories”
- New partnership touts nuclear-powered AI with minimal water use (KSL.com (Eva Terry, Deseret News), 2026-07-06) news “exploring the deployment of a 30 megawatt data center”
- Announcing our $1B Series B Led By Sequoia (Valar Atomics, 2026-08-04) primary company “a collaboration on a waterless 30 MW AI factory”
In tabs: plans, operations, local · file plans_ops