VALAR WATCH
Key findingsTheir claims, annotatedEvidenceTake action
374 facts · 512 sources · updated 2026-09-30

Claims vs Record disc-033

unresolvedsafety Spent fuel to 'a DOE-approved facility' no record names; the state permit Utah law requires was not found

What was said

What the record shows

The gap: Where Ward 250's spent core will go, when, and who pays if Valar cannot, are not stated in any record read. The state permit Utah law requires to store it here in the meantime was not found. A federal-state pact cites Ward 250's 'successful permitting', which can fairly mean DOE's authorization, while no state permit appears in the record; and the state lab's FAQ tells residents Valar 'will not produce spent reactor fuel with this reactor', which DOE's own review contradicts in plain terms.
In plain termsWhen Ward 250's test ends, its used fuel stays dangerously radioactive and must go somewhere. DOE's review says it will go in casks to 'a DOE-approved facility,' without saying which one or when. Utah law lets such waste be stored in the state only with a state permit and license, and none naming Valar could be found. Meanwhile, the governor and the Energy Secretary signed a pact that points to Ward 250's 'successful permitting' as the model for a Utah campus that could take other states' spent fuel. The permits on record are DOE's; the state's own permit is not.

Why it matters: Spent fuel is the longest-lasting hazard a reactor leaves; the public has no named destination, date or state permit.

What would settle it: FOIA to DOE Idaho Operations Office for the OTA's waste and decommissioning terms and the spent-fuel disposition plan; GRAMA to Utah DEQ's Division of Waste Management and Radiation Control for any application, permit or license naming Valar under Utah Code 19-3-321.

facts safe-023, csite-023, gov-017, gov-030, gov-032 · checked 2026-09-29: Defence pass 2026-09-29: Defended: 'successful permitting' read as DOE's authorization (fair); DOE's CX does commit to removal and 'No radioactive waste will be left on site'. Added the lab FAQ's 'will not produce spent reactor fuel' statement, found in this pass, beside DOE's 'spent fuel' wording, with its likely meaning. No destination, date or DWMRC permit found. Status stays unresolved; summary line literally true. | Earlier verify pass: Re-read on 2026-09-29: CX pp. 1 and 4 (quotes exact), NSDA p. 9, Hogan Lovells, Utah Code 19-3-321, NLIC MOU page 1 (image; quote exact). 'Successful permitting' can fairly refer to DOE's authorization; the gap is the missing state permit and destination, not the word. | Correction 2026-09-29 (wording review): verification wording updated ('summary line').